You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Transportation
  2. Development of Light-Weight, Low-Cost Multichannels Membrane Reformer

    SBC: ATS-MER, LLC            Topic: N/A

    Not Available Satellites are linked to an earth station by transmitting and receiving a microwave beam through antennas. The current antennas of choice for earth stations are parabolic reflector antennas such as those used for tracking telemetry and control (TT&C) for the AFSCN. These antennas are required to have horizon-to-horizon, full-hemispherical coverage and often several antennas are requ ...

    SBIR Phase I 1999 Department of Transportation
  3. Advanced EOC Cushioning Units with Electrically Activated Lockout

    SBC: Sharma & Associates, Inc.            Topic: N/A

    Not Available Austral Engineering and Software, Inc. proposes to develop a methodology and computer tool that uses experimental data to create high-fidelity models for unsteady aerodynamic loading. This approach addresses the need for advanced models that accurately represent loading responses of air vehicles under varied flight conditions. This is particularly important for cost-effective develo ...

    SBIR Phase I 1999 Department of Transportation
  4. CFC-Free Refrigeration Process

    SBC: SIGMA TECHNOLOGIES INTERNATIONAL GROUP, INC.            Topic: N/A

    Not Available Digital Signal Processing ASICs can currently be created using Commercial Development Environments. However, none of them can produce Rad Hard ASICs. This project will expand an existing Commercial Development Environment so that it can develop digital signal processing ASICs at Lockheed Martin Federal Systems. This tool allows a user to develop the ASIC in block diagram format, ver ...

    SBIR Phase I 1999 Environmental Protection Agency
US Flag An Official Website of the United States Government