You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Green Materials for Doubling the Life of Drinking Water Pipeline

    SBC: HJ3 Composite Technologies, LLC            Topic: B

    Of the18,000 miles of pre-stressed concrete cylinder pipe (PCCP) within the drinking water transmission infrastructure laid between 1945 and 1996 in the United States, almost one-half, or 8,600 miles of pipe, is considered to be end-of-life infrastructure, awaiting funding for replacement. The American Society of Civil Engineers (ASCE) gave the United States a grade of D for its drinking water inf ...

    SBIR Phase I 2014 Environmental Protection Agency
US Flag An Official Website of the United States Government