You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SAFE AND ECONOMICAL CHLORINE DIOXIDE GENERATION

    SBC: Eltech Research Corpon            Topic: N/A

    SAFE, COST EFFECTIVE ALTERNATIVES TO CHLORINE TREATMENT OF DRINKING WATER FOR DISTRIBUTION AND DISINFECTION HAVE BEEN SOUGHT FOR SOME TIME. CHLORINE DIOXIDE IS A VIABLE ALTERNATIVE TO CHLORINE FOR THE TREATMENT OF EVEN POOR QUALITY WATER SUPPLIES AND THE REDUCTION OF POTENTIAL CANCER CAUSING CHLORINATED ORGANICS. ITS WIDESPREAD USE HAS BEEN INHIBITED BY THE COSTS AND/OR COMPLEXITY OF ITS PRODUCTIO ...

    SBIR Phase I 1989 Environmental Protection Agency
  2. DOUBLE HEAT EXCHANGES SYSTEM FOR MINIMIZING ENERGY AND POLLUTION CONTROL COSTS IN INDUSTRIAL PROCESSES

    SBC: Energy Innovations, Inc.            Topic: N/A

    THERE ARE NUMEROUS INDUSTRIAL PROCESSES REQUIRING THAT MATERIAL BE HEATED AND THEN SUBSEQUENTLY COOLED. IF MOST OF THIS HEAT IS RECOVERED AND RECYCLED TO THE OVEN, THE NET POWER INPUT TO THE OVEN COULD BE SUBSTANTIALLY REDUCED. THE KEY TO ACCOMPLISHING THIS IS AN INCREASE OF THE HEAT TRANSFER COEFFICIENT BETWEEN GAS AND MATERIAL SO THAT THE HEAT EXCHANGERS ARE RESASONABLY COMPACT. SIMPLE EXPERIMEN ...

    SBIR Phase I 1989 Environmental Protection Agency
  3. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    OVER THE LAST SEVERAL YEARS, THE EPA HAS DEVOTED MAJOR EF- FORTS TO IDENTIFY AND DOCUMENT THE MAGNITUDE OF THE RISKS OFENVIRONMENTAL POLLUTION DUE TO LEAKING UDERGROUND STORAGE TANKS (UST). IN APRIL 1987, THE EPA PUBLISHED THE PROPOSED REGULATIONS FOR THE OWNERS AND OPERATORS OF UST, WHICH ARE EXPECTED TO BE FINALIZEDD IN EARLY 1988. THESE REGULATIONS INCLUDE REQUIREMENTS FOR TANK TIGHTNESS TESTS, ...

    SBIR Phase II 1989 Environmental Protection Agency
  4. RECYCLING OF DUST FROM ELECTRIC ARC FURNACES

    SBC: Pei Associates Inc            Topic: N/A

    THE MAJOR SHORTCOMINGS OF THE VARIOUS PROCESSES SUGGESTED BY RECYCLING METALLURGICAL DUST HAVE BEEN THE HIGH CAPITAL COST OF THE EQUIPMENT AND THE NEED FOR LARGE QUANTITIES OF DUST FOR THE PROCESSES TO BE ECONOMICAL. ELECTRIC ARC FURNACE DUST IS NOT AMENABLE TO THESE PROCESSES BECAUSE IT IS GENERATED IN SMALL QUANTITIES AND A LARGE NUMBER OF LOCATIONS, DISTANT FROM INDUSTRIAL CENTERS WHERE REGIONA ...

    SBIR Phase II 1984 Environmental Protection Agency
  5. THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.

    SBC: Pei Associates Inc            Topic: N/A

    THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.S. COAL RESERVES IS THREATENED BY AN OVERALL DECLINE IN THE DEMAND OF POWER, THE HIGH COST OF FINANCING NEW PLANTS, MORE STRINGENT REGULATORY REQUIREMENTS, AND INEFFICIENT ENERGY RECOVERY AND POLLUTION CONTROL. CONVENTIONAL AND ESTABLISHED EMERGING COAL-FIRED POWER GENERATION TECHNOLOGIES DO NOT APPEAR TO OFFER THE DESIGN TECHNOLOGY BREAK-THROUGH N ...

    SBIR Phase I 1984 Environmental Protection Agency
US Flag An Official Website of the United States Government