You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ELECTROTHERMAL REFORMING OF HAZARDOUS ORGANICS AND WATER- SOLUBLE WASTES

    SBC: A1-chem Fuels Inc.            Topic: N/A

    A1-CHEM FUELS, INC. HAS A PATENT PENDING FOR AN ELECTROTHER-MAL DEVICE TO PRODUCE MEDIUM TO HIGH BTU FUEL GAS FROM WASTEHYDROCARBON SOURCES. THIS UNIT OPERATES BY PRODUCING A HIGH-VOLTAGE ALTERNATING CURRENT ELECTRIC DISCHARGE ACROSS THE INTERFACE BETWEEN A WASTE HYDROCARBON AND WATER. THE EXTREMELY HIGH TEMPERATURE WITHIN THE ELECTRICAL DISCHARGE IS SUFFICIENT TO CAUSE LOCALIZED FAST PYROLYSIS OF ...

    SBIR Phase II 1988 Environmental Protection Agency
  2. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    N/A

    SBIR Phase I 1988 Environmental Protection Agency
  3. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government