The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Biomass Energy Process for Poultry Growing Operations

    SBC: Neathery Technologies, Inc.            Topic: N/A

    The U.S. poultry industry produces more than 45 billion pounds of poultry annually. A majority of this production is from concentrated animal feeding operations. In a modern poultry growing facility, small chicks are raised in several large houses that typically cover over 20,000 ft2. Starting with each grow-out period, fresh wood mulch bedding material is spread over the house floor. Over the co ...

    SBIR Phase I 2007 Environmental Protection Agency
  2. A Biomass Energy Process for Poultry Growing Operations

    SBC: Neathery Technologies, Inc.            Topic: 06NCERB4

    The U.S. poultry industry produces more than 45 billion pounds of poultry annually. A majority of this production is from concentrated animal feeding operations. In a modern poultry growing facility, small chicks are raised in several large “houses” that typically cover over 20,000 ft2. Starting with each grow-out period, fresh wood mulch bedding material is spread over the house floor. Ove ...

    SBIR Phase I 2007 Environmental Protection Agency
  3. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. AiHigh Fidelity, Library Based THz Air Toxic Monitoring System for Neighborhood-Level Surveillance

    SBC: Edvance Research, Inc.            Topic: 2A

    The industrialization and urbanization movements have resulted in air pollutants being commonplace in industrial and residential areas; pollutants are produced by automobiles, manufacturing processes, and home improvement, among other activities. Air toxics pose a significant risk to public health and lower quality of life due to both acute and chronic health impacts. Therefore, there is a need fo ...

    SBIR Phase I 2023 Environmental Protection Agency
  5. A Low-Cost, High-Temperature Mercury Sorbent for Coal-Fired Power Plants

    SBC: Sorbent Technologies Corp            Topic: N/A

    The results of the Phase I project increase the likelihood that the project's new technology will make a major contribution to a healthier world environment. First, the U.S. EPA is introducing mercury-control standards on power plants requiring significant emission reductions from over 1,000 utility coal-fired boilers. A regulatory timetable has now been set, which will lead to the installation of ...

    SBIR Phase I 2001 Environmental Protection Agency
  6. A Low-Cost, High-Temperature Mercury Sorbent for Coal-Fired Power Plants

    SBC: Sorbent Technologies Corp            Topic: N/A

    The results of the Phase I project increase the likelihood that the project's new technology will make a major contribution to a healthier world environment. First, the U.S. EPA is introducing mercury-control standards on power plants requiring significant emission reductions from over 1,000 utility coal-fired boilers. A regulatory timetable has now been set, which will lead to the installation of ...

    SBIR Phase II 2001 Environmental Protection Agency
  7. A Micro-Variable Circular Orifice (MVOC) Fuel Injector with Variable Spray Angles and Patterns for Reducting NOx Emissions from Diesel Engines

    SBC: Quantlogic Corporation            Topic: N/A

    Diesel engines are widely used due to their high fuel efficiency. However, conventional diesel engines have high NOx and soot emissions. Selective catalytic reduction (SCR) for NOx reduction is less accepted by the construction industry due to complexity and cost. In-cylinder NOx reduction is more desirable. When low temperature combustion and/or premixed charge compression ignition (PCCI) combus ...

    SBIR Phase I 2008 Environmental Protection Agency
  8. A New Microfludic System for the Determination of Cryptosporidium Oocysts in Water

    SBC: LYNNTECH INC.            Topic: N/A

    Cryptosporidium, originating from contamination of public drinking water supplies, ponds, rivers, or swimming pools, have cause large-scale and deadly outbreaks, which became a major cause of waterborne infectious diseases. Since 1991, the percent of outbreaks attributable to Cryptosporidium has doubled, and in the 1993-1994 period, 17 percent of all outbreaks were caused by Cryptosporidium. In 19 ...

    SBIR Phase I 2001 Environmental Protection Agency
  9. A New Microfludic System for the Determination of Cryptosporidium Oocysts in Water

    SBC: LYNNTECH INC.            Topic: N/A

    Cryptosporidium, originating from contamination of public drinking water supplies, ponds, rivers, or swimming pools, have cause large-scale and deadly outbreaks, which became a major cause of waterborne infectious diseases. Since 1991, the percent of outbreaks attributable to Cryptosporidium has doubled, and in the 1993-1994 period, 17 percent of all outbreaks were caused by Cryptosporidium. In 19 ...

    SBIR Phase II 2001 Environmental Protection Agency
  10. An Inexpensive Biological and Chemical Decontamination Solution from a Powdered Concentrate

    SBC: LYNNTECH INC.            Topic: N/A

    All levels of government and law enforcement are making plans to contain the effects of a terrorist attach using CBW agents. An important containment strategy is to enable emergency response personnel (police, fire fighters, etc.) to neutralize the threat using decontamination methods. The two primary decontamination solutions used by the military are supertropical bleach and DS2, neither of whi ...

    SBIR Phase I 2007 Environmental Protection Agency