You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A BATTLEFIELD SEISMIC NETWORK SYSTEM

    SBC: North American Geotechnical Company            Topic: N/A

    ALGORITHMS ARE DERIVED THAT DEFINE THE PATHS OF MAXIMUM COHERENCY FOR A SEISMIC EVENT GENERATED BY FIRING AN ARTILLERY WEAPON FROM AN ARBITRARY LOCATION. SIGNAL EXTRACTION TECHNIQUES ARE DESCRIBED TO EXTRACT THE COHERENT SIGNAL FROM AN EVENT RECORDED ON MULTIPLE RECEIVERS. SIMULATED BATTLEFIELD RECORDINGS ARE GENERATED BY TREATING THE SEISMIC SIGNATURE OF ARTILLERY WEAPONS AS IMPULSE RESPONSES FRO ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. ACCELERATION SENSING MODULE FOR MUNITION SAFETY SYSTEMS

    SBC: ELECTRONICS DEVELOPMENT CORP            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  3. A CMOS ARRAY PROCESSOR BASED ON THE TMS 320

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  4. ADA COST ESTIMATING MODEL

    SBC: Institute For Systems Analysis            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  5. ADA PROGRAMMING SUPPORT ENVIRONMENT (APSE) DEFINITION

    SBC: Statistica Inc            Topic: N/A

    THE OBJECTIVE OF THIS TASK IS TO DEFINE ONE OR MORE APSE(S) FOR THE AIRMICS COMMAND BASED ON THE DEVELOPMENT, ENHANCEMENT, AND MAINTENANCECHARACTERISTICS FOR MANAGEMENT INFORMATION SYSTEMS (MISS). APSE(S) WILL BE FORMED FOR THESE THREE MAJOR DOMAINS, WITH EMPHASIS ON LARGE, MEDIUM, AND SMALL SYSTEMS. DURING PHASE I, RESEARCH IS PERFORMED TO IDENTIFY EXISTING CASE TOOLS, ENVIRONMENTS, METHODOLOGIES ...

    SBIR Phase I 1990 Department of DefenseArmy
  6. ADAPTIVE DIVERSITY RECEPTION AT HF

    SBC: REKENTHALER TECHNOLOGY ASSOC.            Topic: N/A

    HF SIGNAL FADING FREQUENTLY RESULTS FROM MUTUALLY INTERFERING MULTIPATH SIGNAL EFFECTS CAUSED BY GROUND OR OCEAN REFLECTION OF THE ELECTROMAGNETIC WAVES ALONG DIVERSE PROPAGATION PATHS. THIS PHASE I SBIR PROGRAM EXPLOITS INNOVATIVE NONLINEAR DYNAMICAL (NDL) SIGNAL PROCESSING METHODOLOGIES TO MODEL, PREDICT AND MINIMIZE THE UNDERLYING ELECTRODYNAMIC SYSTEM PROCESSES, THEREBY REDUCING BACKGROUND NOI ...

    SBIR Phase I 1990 Department of DefenseNavy
  7. ADAPTIVE GRID TECHNIQUES FOR USE IN COMPUTATIONAL FLUID DYNAMICS

    SBC: Computational Mechan            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  8. ADVANCED ADAPTIVE COMPUTATIONAL METHODS FOR NAVIER-STOKES SIMULATIONS IN ROTORCRAFT AERODYNAMICS

    SBC: Computational Mechan            Topic: N/A

    A NEW AND INNOVATIVE CLASS OF ADAPTIVE COMPUTATIONAL PROCEDURES IS TO BE DEVELOPED FOR THE SPECIFIC PURPOSE OF NUMERICALLY-MODELING COMPLEX FLOWS INHERENT IN ADVANCED HELICOPTER-BLADE DESIGNS. THESE PROCEDURES MAKE USE OF MATHEMATICALLY CONSISTENT ESTIMATES OF LOCAL NUMERICAL ERROR, AND AUTOMATICALLY REFINE OR UNREFINE THE MESH OR INCREASE OR DECREASE THE LOCAL SPECTRAL ORDER OF THE APPROXIMATION ...

    SBIR Phase II 1990 Department of DefenseArmy
  9. ADVANCED MICROCONDUCTIVITY PROBE FOR OCEANIC USE DEVELOPMENT

    SBC: General Technology Inc            Topic: N/A

    A NEW HIGH-FREQUENCY, NONFOULING, FOUR-ELECTRODE, OPEN-CELL CONDUCTIVITY SENSOR FOR OCEANIC USE IS PROPOSED. THIS SENSOR IS TO REPLACE THE COMMONLY USED CONDUCTIVITY CELL MADE BY N. BROWN INSTRUMENT SYSTEM. THE NEW SENSOR WILL BE DESIGNED TO MINIMIZE OR ELIMINATE PROBLEMS ASSOCIATED WITH N. BROWN CONDUCTIVITY CELL. SOME STRINGENT DESIGN CRITERIA ARE SET FOR THE NEW CONDUCTIVITY SENSOR: 1. THE SENS ...

    SBIR Phase II 1986 Department of DefenseNavy
  10. ADVANCED OPTICAL SYSTEMS PROPOSES TO CONCEPTUALLY DESIGN, EXPERIMENTALLY VALIDATE AND DOCUMENT A MULTI-POINT FIBER-OPTIC NETWORK TO SUPPORT SIMULTANEOUS MULTIPLE RADAR SYSTEM INPUTS.

    SBC: Advanced Optical Systems, Inc            Topic: N/A

    ADVANCED OPTICAL SYSTEMS PROPOSES TO CONCEPTUALLY DESIGN, EXPERIMENTALLY VALIDATE AND DOCUMENT A MULTI-POINT FIBER-OPTIC NETWORK TO SUPPORT SIMULTANEOUS MULTIPLE RADAR SYSTEM INPUTS. THE PROPOSED NETWORK DESIGN WILL INCLUDE THE NETWORK TOPOLOGY, PROTOCOL STRUCTURE, AND CRITICAL ITEM SPECIFICATIONS NECESSARY TO SUPPORT BEACON/IFF, ANALOG RADAR VIDEO CHANNELS, AND CONTROL INFORMATION OVER THE NETWOR ...

    SBIR Phase I 1986 Department of DefenseNavy
US Flag An Official Website of the United States Government