You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. ECONOMIC REMOVAL OF HYDROGEN SULFIDE FRM NATURAL GAS AND OIL

    SBC: Oaks Travel Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Environmental Protection Agency
  3. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. IMPROVED METHOD FOR HEATING CATALYTIC CONVERTERS OF VEHICLES TO ATTAIN ULTRA-LOW EMISSIONS

    SBC: LYNNTECH INC.            Topic: AirQuality

    THE THREE-WAY CATALYTIC CONVERTER IS THE MOST IMPORTANT DEVICE MAKING TODAY'S AUTOMOBILES COMPLY WITH EXISTING EMISSION LAWS. THE FIRST TWO OR THREE MILES IN A TYPICAL 22-MINUTE, 12-MILE COMUTE IN TODAY'S VEHICLES RESULT IN THE EMISSION OF HALF OF THE TOTAL NON-METHANE HYDROCARBONS, WHICH RESULT IN THE PRODUCTION OF URBAN SMOG, AS WELL AS HALF OF THE TOXIC CO EMISSIONS. THIS OCCURS BECAUSE THE CAT ...

    SBIR Phase II 1994 Environmental Protection Agency
  5. INTERGRATING FIBER OPTIC RADIATION DOSIMETER

    SBC: Quantix Corp            Topic: N/A

    N/A

    SBIR Phase I 1986 Nuclear Regulatory Commission
  6. Organophosphate Degrading Enzymes

    SBC: AGAVE BIOSYSTEMS INC.            Topic: N/A

    Agve BioSystems in collaboration with Carl A. Batt propose to develop decon-nanoparticles which will leverage ongoing opportunities in enzyme engineering and the fabrication of functionalized magnetic nanoparticles. Enhanced performance will be engineered into the system to improve the catalytic degradation of chemical agents. Through an iterative process optimizing the particles and the enzyme ...

    SBIR Phase I 2009 Environmental Protection Agency
  7. Organophosphate Degrading Enzymes

    SBC: AGAVE BIOSYSTEMS INC.            Topic: 08NCERI1

    Agave BioSystems in collaboration with Carl A. Batt proposes to develop decon-nanoparticles, which will leverage ongoing opportunities in enzyme engineering and the fabrication of functionalized magnetic nanoparticles. Enhanced performance will be engineered into the system to improve the catalytic degradation of chemical agents. Through an iterative process optimizing the particles and the enzy ...

    SBIR Phase I 2009 Environmental Protection Agency
  8. PULSE COMBUSTION

    SBC: Management Tech Consult Inc.            Topic: N/A

    AN INNOVATIVE , COMBUSTION METHOD USING A COAL-MELT ATOMIZERIS PROPOSED. THIS COMBUSTION METHOD MAKES IT POSSIBLE FOR COMPLETE CARBON UTILIZATION AND SIMULTANEOUS CONTROL OF NOX,SO2, AND PARTICULATE MATTER FOR NEW UNITS AND RETROFIT SIT UATIONS FOR REPLACING OIL AND GAS IN EXISTING UNITS. MANAGEMENT AND TECHNICAL CONSULTANTS INC. (MTCI) PROPOSES TO USE A PULSE BURNER TO WHICH MELTED COAL WILL BE F ...

    SBIR Phase I 1986 Environmental Protection Agency
  9. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. Ultra Low-Power Miniaturized Flexible Radio Optimized for Long-Term Battery Operation

    SBC: CROSSFIELD TECHNOLOGY LLC            Topic: DMEA0703

    Crossfield intends to develop a single chip, low-power, flexible radio transceiver in ultrawideband technology that is battery operated and can support wireless sensor network applications not currently addressed by off-the-shelf wireless standards such as IEEE802.15.4. By implementing an ultrawideband (UWB) radio, a the power consumption can be reduced by an order of magnitude over existing radio ...

    SBIR Phase II 2009 Department of DefenseDefense Microelectronics Activity
US Flag An Official Website of the United States Government