You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. METHOD FOR OPENING AND EMPTYING THE CONTENTS OF PLASTIC BAGS ENTERING RECYCLING FACILITIES

    SBC: National Recovery Technologies LLC            Topic: N/A

    MANY U.S. MUNICIPALITIES AND COMMUNITIES ARE INTEGRATING RECYCLING PROGRAMS IN THE MANAGEMENT OF THEIR SOLID WASTE IN ORDER TO MINIMIZE LANDFILL REQUIREMENTS. INCREASINGLY, THESE RECYCLING PROGRAMS INCLUDE MATERIALS RECOVERY FACILITIES (MRF) WHERE THE MUNICIPAL SOLID WASTE (MSW), CURBSIDE COLLECTED RECYCLABLE MATERIALS, AND OTHER BAGGED WASTES ARE TRANSPORTED TO A CENTRAL LOCATION FOR THE RETRIEVA ...

    SBIR Phase II 1993 Environmental Protection Agency
  2. CHLORINATED PLASTICS SEPARATION FROM MUNICIPAL SOLID WASTE

    SBC: National Recovery Technologies LLC            Topic: N/A

    MUNICIPAL SOLID WASTE (MSW) PROVIDES A WASTE FUEL SOURCE HAVING POTENTIAL RECOVERABLE ENERGY OF OVER 1.5 QUADS PER YEAR.EXPANDED USE OF THIS FUEL SOURCE THROUGH ENERGY RECOVERY IN-INCINERATION OF MSW IS THREATENED BY THE PRESENCE OF CHLO- RINE IN MSW. CHLORINE IS A PRIMARY FACTOR IN THE FORMATION OF TOXIC CHLORINATED ORGANICS SUCH AS DOXINS AND FURANS. CHLORINE IS ALSO A MAJOR CONTRIBUTOR TO ACID ...

    SBIR Phase II 1989 Environmental Protection Agency
  3. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    OVER THE LAST SEVERAL YEARS, THE EPA HAS DEVOTED MAJOR EF- FORTS TO IDENTIFY AND DOCUMENT THE MAGNITUDE OF THE RISKS OFENVIRONMENTAL POLLUTION DUE TO LEAKING UDERGROUND STORAGE TANKS (UST). IN APRIL 1987, THE EPA PUBLISHED THE PROPOSED REGULATIONS FOR THE OWNERS AND OPERATORS OF UST, WHICH ARE EXPECTED TO BE FINALIZEDD IN EARLY 1988. THESE REGULATIONS INCLUDE REQUIREMENTS FOR TANK TIGHTNESS TESTS, ...

    SBIR Phase II 1989 Environmental Protection Agency
  4. MERCURY-FREE HIGH CRI EFFICIENT LAMP

    SBC: Fusion Systems Corp.            Topic: N/A

    FUSION SYSTEMS HAS DEVELOPED A MERCURY-FREE, HIGH COLOR RENDERING, EFFICIENT LAMP USING PROPRIETARY BUT BENIGN LAMP FILLS. THEY PROPOSE TO INVESTIGATE VARIATIONS OF THE LAMP SYSTEM PARAMETERS WITH THE DUAL GIALS OF FURTHER INCREASING SYSTEM EFFICIENCY BY 1.5 X AND TO IMPROVE LAMP STARTING DOWN TO MINUS 40C. BOTH FACTORS ARE CRITICAL TOWARD ACHIEVING COMMERCIAL SUCCESS. THE NEW LAMP IS A MICROWAVE ...

    SBIR Phase II 1993 Environmental Protection Agency
  5. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    A SELF-POWERED RADIATION DETECTOR THAT CAN BE USED TO DETECTTHE SOURCE POSITION IN INDUSTRIAL RADIOGRAPHIC EQUIPMENT IS NEEDED. SELF-POWERED DETECTORS HAVE TRADITIONALLY BEEN USEDINFLUX MAPPING SYSTEMS IN NUCLEAR REACTORS BECAUSE OF THEIR SIZE, RUGGEDNESS AND SIMPLICITY. THIS DETECTOR CONCEP PROVIDES THE UNIQUE OPPORTUNITY FOR THE DEVELOPMENT OF LARGECROSS SECTIONAL AREA DETECTORS THATCAN BE USED ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  6. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    PERIODIC RESPONSE TIME TESTING HAS BEEN PERFORMED FOR THE PAST TWELVE YEARS ON THE SAFETY SYSTEM PRESSURE SENSORS IN MANY NUCLEAR POWER PLANTS. HOWEVER, THE RESULTS OF THESE TESTS ARE NOT RELIABLE FOR ASSESSMENT OF AGING EFFECTS. THEIS BECAUSE INADEQUATE METHODS AND PROCEDURES HAVE BEEN USED IN PERFORMING THE MAJORITY OF THE TESTS. THIS PROPOSAL OFFFERS AN EXPERIMENTAL RESEARCH PROJECT TO PROVIDE ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government