You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. INTERGRATING FIBER OPTIC RADIATION DOSIMETER

    SBC: Quantix Corp            Topic: N/A

    THE PROPOSED PROJECT WILL DEMONSTRATE THE FEASIBILITY OF EMPLOYING ELECTRON TRAPPING (ET) MATERIALS WITH FIBER OPTICS FILAMENTS FOR USE AS MICROPROBE RADIATION DOSIMETERS.THE ET MATERIALS TM CAN BE INTERROGATED BY NEAR-INFRARED TO PRODUCE VISIBLE OUTPUT SCALABLE TO RADIATION DOSES AT THE FIBER TIP. PHASE I WILL ASSESS THE PERFORMANCE OF SUCH MATERIALS AS MICROPORBE RADIATION DETECTORS INTEGRATED W ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  2. ULTRA-TRACE ANALYSIS OF WATER AND WASTEWATER

    SBC: Ionics International, Inc.            Topic: N/A

    IONICS RESEARCH INC. (IRI) HAS DETERMINED THAT UNCOATED CAPILLARY COLUMNS CAN BE USED TO CONCENTRATE ORGANICS FROM WATER. THE METHOD IS EXCEEDINGLY SIMPLE AND RAPID (10 MINUTES PER 100 ML), YET EFFECTIVE. IRI PLANS TO INVESTIGATE THE POTENTIAL OF THIS TECHNIQUE FOR THE DEVELOPMENT OF AN INSTRUMENT SUITABLE FOR THA NALYSIS OF ORGANICS AT THE PART-PER-TRILLION LEVEL IN WATER AND WASTEWATER. SUCH AN ...

    SBIR Phase II 1987 Environmental Protection Agency
  3. ECONOMIC REMOVAL OF HYDROGEN SULFIDE FRM NATURAL GAS AND OIL

    SBC: Oaks Travel Inc.            Topic: N/A

    THIS PROPOSAL IS CONCERNED WITH THE ECONOMIC REMOVAL OF HYDROGEN SULFIDE, A TOXIC MATERIAL, FROM SOUR NATURAL GAS AND PETROLEUM PRODUCTS. THE CURRENT STATUS OF H2S PROCESSING IS REVIEWED. THE CHEMISTRY OF SULFUR AND SULFIDE IN AQUEOUS SOLUTIONS AND PRELIMINARY WORK ALREADY CARRIED OUT IN THE CONTINUOUS ELECTROLYSIS OF H2S TO YIELD HYDROGEN AND SULFUR ARE BRIEFLYDISCUSSED. THE ESTIMATED ECONOMIC GA ...

    SBIR Phase II 1987 Environmental Protection Agency
  4. ANALYSIS OF STATE-OF-THE-ART METHODS FOR CONTAINMENT INTEGRATED LEAK RATE TESTING

    SBC: Sentry Equipment Corp.            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. ELECTROTHERMAL REFORMING OF HAZARDOUS ORGANICS AND WATER- SOLUBLE WASTES

    SBC: A1-chem Fuels Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Environmental Protection Agency
  6. "MITIGATION OF ACID RAIN AND OXIDANT IMPACTS ON CROPS AND FORESTS UTILIZING MARINE EXTRACTS"

    SBC: Maricultura Inc            Topic: N/A

    RECENT ASSESSMENTS ESTIMATE U.S. CROP LOSSES FROM ELEVATED OZONE LEVEL AND OTHER OXIDANTS (SULFUR DIOXIDE, NITROGEN DIOXIDE) TO BE AS MUCH AS $5 BILLION ANNUALLY. ADDITIONALLY,SEVERE FOREST DAMAGE MAY RESULT FROMPOLLUTION-RELATED OXI- DANTS PARTICULARLY IN EUROPE WHERE THERE HAS BEEN A DRAMATICDECLINE IN FOREST ECOSYSTEMS OVER THE PAST SIX YEARS. THIS RESEARCH IS DIRECTED AT THE MITIGATION OF SUCH ...

    SBIR Phase I 1987 Environmental Protection Agency
  7. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  8. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government