List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. INTERGRATING FIBER OPTIC RADIATION DOSIMETER

    SBC: Quantix Corp            Topic: N/A

    THE PROPOSED PROJECT WILL DEMONSTRATE THE FEASIBILITY OF EMPLOYING ELECTRON TRAPPING (ET) MATERIALS WITH FIBER OPTICS FILAMENTS FOR USE AS MICROPROBE RADIATION DOSIMETERS.THE ET MATERIALS TM CAN BE INTERROGATED BY NEAR-INFRARED TO PRODUCE VISIBLE OUTPUT SCALABLE TO RADIATION DOSES AT THE FIBER TIP. PHASE I WILL ASSESS THE PERFORMANCE OF SUCH MATERIALS AS MICROPORBE RADIATION DETECTORS INTEGRATED W ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  2. ULTRA-TRACE ANALYSIS OF WATER AND WASTEWATER

    SBC: Ionics International, Inc.            Topic: N/A

    IONICS RESEARCH INC. (IRI) HAS DETERMINED THAT UNCOATED CAPILLARY COLUMNS CAN BE USED TO CONCENTRATE ORGANICS FROM WATER. THE METHOD IS EXCEEDINGLY SIMPLE AND RAPID (10 MINUTES PER 100 ML), YET EFFECTIVE. IRI PLANS TO INVESTIGATE THE POTENTIAL OF THIS TECHNIQUE FOR THE DEVELOPMENT OF AN INSTRUMENT SUITABLE FOR THA NALYSIS OF ORGANICS AT THE PART-PER-TRILLION LEVEL IN WATER AND WASTEWATER. SUCH AN ...

    SBIR Phase II 1987 Environmental Protection Agency
  3. ECONOMIC REMOVAL OF HYDROGEN SULFIDE FRM NATURAL GAS AND OIL

    SBC: Oaks Travel Inc.            Topic: N/A

    THIS PROPOSAL IS CONCERNED WITH THE ECONOMIC REMOVAL OF HYDROGEN SULFIDE, A TOXIC MATERIAL, FROM SOUR NATURAL GAS AND PETROLEUM PRODUCTS. THE CURRENT STATUS OF H2S PROCESSING IS REVIEWED. THE CHEMISTRY OF SULFUR AND SULFIDE IN AQUEOUS SOLUTIONS AND PRELIMINARY WORK ALREADY CARRIED OUT IN THE CONTINUOUS ELECTROLYSIS OF H2S TO YIELD HYDROGEN AND SULFUR ARE BRIEFLYDISCUSSED. THE ESTIMATED ECONOMIC GA ...

    SBIR Phase II 1987 Environmental Protection Agency
  4. Novel Field Deployable Electrochemical Sensor for the Detection and Long-Term Monitoring of Pollutants

    SBC: Lynntech Inc.            Topic: N/A

    Chlorinated hydrocarbons represent the most prevalent contaminants of groundwater in the country. When released in the subsurface, they tend to persist below the water table, and it can take decades or centuries before slow-moving groundwater completely dissolves accumulations of chlorinated solvent product. Analytical methods currently available for monitoring these compounds require extensive ...

    SBIR Phase I 1997 Environmental Protection Agency
  5. Low Cost Heavy Metals Removal from Hazardous Wastewaters

    SBC: Lynntech Inc.            Topic: N/A

    Heavy metal species mobilized and released into the environment by technological activities tend to persist indefinitely, circulating and eventually accumulating throughout the food chain, posing a serious threat to the environment, animals, and humans. Typical industrial metal-containing discharges can be considered as point-source emissions, which in turn offer the possibility of feasible remed ...

    SBIR Phase I 1997 Environmental Protection Agency
  6. Development of a Low Toxicity Treatment for Zebra Mussels

    SBC: Pharmacognetics, Inc.            Topic: N/A

    Zebra mussels cause an estimated $5 billion in economic damages annually. They clog water intake pipes, damage water supplies, threaten native fish and aquatic species, and promote the mobilization of toxic materials into the food chain. Chlorination is presently the most common treatment for zebra mussels. However, chlorine causes many serious environmental risks, thus necessitating the develo ...

    SBIR Phase I 1997 Environmental Protection Agency
  7. Development of a Multianalyte Biosensor Instrument

    SBC: Ergopedia, Inc.            Topic: N/A

    This Phase I project will develop a multianalyte biosensor field screening instrument (MBFI). The MBFI has the potential to reduce the annual cost of environmental analyses in the United States by more than $20 million and to reduce the analysis turnaround time from approximately 19 days to less than 15 minutes. The major barrier to the development of a biosensor instrument for environmental mea ...

    SBIR Phase I 1997 Environmental Protection Agency
  8. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. ELECTROTHERMAL REFORMING OF HAZARDOUS ORGANICS AND WATER- SOLUBLE WASTES

    SBC: A1-chem Fuels Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Environmental Protection Agency
  10. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government