You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SURFACTANT FLUSHING/WASHING--AN INNOVATIVE METHOD OF HAZARDOUS WASTE TREATMENT

    SBC: Eckenfelder Inc.            Topic: N/A

    THE TECHNICAL OBJECTIVES OF THIS PROPOSAL ARE ORIENTED TOWARD THE DEVELOPMENT OF SOIL SURFACTANT FLUSHING AND WASHING AS A LOW-COST, LOW-IMPACT, LOW-RISK, EFFECTIVE TECHNIQUE FOR THE REMOVAL AND ULTIMATE DESTRUCTION OF THE ORGANIC CONTAMINANTS IN SOIL. THESE OBJECTIVES ARE: DEMONSTRATION OF THE EFFECTIVENESS OF AN IONIC SURFACTANT SOLUTION AT CONCENTRATIONS ABOVE THE CRITICAL MICELLE CONCENTRATION ...

    SBIR Phase II 1990 Environmental Protection Agency
  2. STEAM REFORMING OF MUNICIPAL WASTEWATER SLUDGE

    SBC: Manufacturing And Technology Conversion Int'l, Inc            Topic: N/A

    THE MTIC INDIRECT STEAM REFORMING PROCESS OFFERS A COST EFFECTIVE ALTERNATIVE TO THE EXISTING WASTE-TO-ENERGY INCINERATION OF MUNICIPAL SLUDGE WASTE (MSW) OR REFUSE- DERIVED FUEL (RDF). THE PROCESS HAS THE POTENTIAL FOR RESOLVING MANY OF THE ENVIRONMENTAL ISSUES ASSOCIATED WITH INCINERATION, ESPECIALLY IN THE CONTROL OF CHLORINATED DIOXINS AND FURANS AS WELL AS EMISSIONS OF TOXIC METALS; PARTICULA ...

    SBIR Phase I 1990 Environmental Protection Agency
  3. FAST LIGHTOFF CATALYTIC CONVERTER

    SBC: PRECISION COMBUSTION, INC.            Topic: N/A

    MUCH OF THE TOTAL OPERATIONAL CYCLE EMISSION FROM AUTOMOBILES OCCURS DURING THE INITIAL MINUTES OF ENGINE OPERATION, BEFORE THE CATALYTIC CONVERTER HAS BEEN SUFFICIENTLY WARMED BY INLET AIR TO REACH FULL OPERATING TEMPERATURE. PRECISION COMBUSTION, INC. (PCI) WILL DEVELOP ITS FAST THERMAL RESPONSE CATALYTIC METAL MONOLITH TECHNOLOGY TO ACHIEVE RAPID EFFECTIVE COLD STARTING PERFORMANCE OF AUTOMOTIV ...

    SBIR Phase II 1990 Environmental Protection Agency
  4. CATALYTICALLY STABILIZED THERMAL INCINERATION OF VOLATILE ORGANIC COMPOUNDS

    SBC: PRECISION COMBUSTION, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Environmental Protection Agency
  5. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government