You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CHLORINATED PLASTICS SEPARATION FROM MUNICIPAL SOLID WASTE

    SBC: National Recovery Technologies LLC            Topic: N/A

    MUNICIPAL SOLID WASTE (MSW) PROVIDES A WASTE FUEL SOURCE HAVING POTENTIAL RECOVERABLE ENERGY OF OVER 1.5 QUADS PER YEAR.EXPANDED USE OF THIS FUEL SOURCE THROUGH ENERGY RECOVERY IN-INCINERATION OF MSW IS THREATENED BY THE PRESENCE OF CHLO- RINE IN MSW. CHLORINE IS A PRIMARY FACTOR IN THE FORMATION OF TOXIC CHLORINATED ORGANICS SUCH AS DOXINS AND FURANS. CHLORINE IS ALSO A MAJOR CONTRIBUTOR TO ACID ...

    SBIR Phase II 1989 Environmental Protection Agency
  2. INNOVATIVE INCINERATION TECHNOLOGY FOR FIBERGLASS MANUFACTURING SOLID AND HAZARDOUS WASTE DISPOSAL/RECYCLING

    SBC: Vortec Corporation            Topic: N/A

    THE PRODUCTION OF INSULATION FIBERGLASS RESULTS IN SUBSTANTIAL QUANTITIES OF WASTE PRODUCTS WHICH MUST BE DISPOSED OF IN HAZARDOUS WASTE LANDFILLS IN SOME STATES. THE COST OF LANDFILLING THESE MATERIALS AT A SINGLE PLANT IS OFTEN IN EXCESS OF $1 MILLION/YEAR WHICH, IN THE END, IS PASSED ON TO THE AMERICAN CONSUMERS AND TAKES UP VALUABLE LANDFILL SPACE. THE DEVELOPMENT OF AN ADVANCED INCINERATOR/GL ...

    SBIR Phase II 1990 Environmental Protection Agency
  3. SURFACTANT FLUSHING/WASHING--AN INNOVATIVE METHOD OF HAZARDOUS WASTE TREATMENT

    SBC: Eckenfelder Inc.            Topic: N/A

    THE TECHNICAL OBJECTIVES OF THIS PROPOSAL ARE ORIENTED TOWARD THE DEVELOPMENT OF SOIL SURFACTANT FLUSHING AND WASHING AS A LOW-COST, LOW-IMPACT, LOW-RISK, EFFECTIVE TECHNIQUE FOR THE REMOVAL AND ULTIMATE DESTRUCTION OF THE ORGANIC CONTAMINANTS IN SOIL. THESE OBJECTIVES ARE: DEMONSTRATION OF THE EFFECTIVENESS OF AN IONIC SURFACTANT SOLUTION AT CONCENTRATIONS ABOVE THE CRITICAL MICELLE CONCENTRATION ...

    SBIR Phase II 1990 Environmental Protection Agency
  4. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    OVER THE LAST SEVERAL YEARS, THE EPA HAS DEVOTED MAJOR EF- FORTS TO IDENTIFY AND DOCUMENT THE MAGNITUDE OF THE RISKS OFENVIRONMENTAL POLLUTION DUE TO LEAKING UDERGROUND STORAGE TANKS (UST). IN APRIL 1987, THE EPA PUBLISHED THE PROPOSED REGULATIONS FOR THE OWNERS AND OPERATORS OF UST, WHICH ARE EXPECTED TO BE FINALIZEDD IN EARLY 1988. THESE REGULATIONS INCLUDE REQUIREMENTS FOR TANK TIGHTNESS TESTS, ...

    SBIR Phase II 1989 Environmental Protection Agency
  5. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    A SELF-POWERED RADIATION DETECTOR THAT CAN BE USED TO DETECTTHE SOURCE POSITION IN INDUSTRIAL RADIOGRAPHIC EQUIPMENT IS NEEDED. SELF-POWERED DETECTORS HAVE TRADITIONALLY BEEN USEDINFLUX MAPPING SYSTEMS IN NUCLEAR REACTORS BECAUSE OF THEIR SIZE, RUGGEDNESS AND SIMPLICITY. THIS DETECTOR CONCEP PROVIDES THE UNIQUE OPPORTUNITY FOR THE DEVELOPMENT OF LARGECROSS SECTIONAL AREA DETECTORS THATCAN BE USED ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  6. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    PERIODIC RESPONSE TIME TESTING HAS BEEN PERFORMED FOR THE PAST TWELVE YEARS ON THE SAFETY SYSTEM PRESSURE SENSORS IN MANY NUCLEAR POWER PLANTS. HOWEVER, THE RESULTS OF THESE TESTS ARE NOT RELIABLE FOR ASSESSMENT OF AGING EFFECTS. THEIS BECAUSE INADEQUATE METHODS AND PROCEDURES HAVE BEEN USED IN PERFORMING THE MAJORITY OF THE TESTS. THIS PROPOSAL OFFFERS AN EXPERIMENTAL RESEARCH PROJECT TO PROVIDE ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  7. MOBILE ZONE PAINT SPRAY BOOTH FOR REDUCTION OF VOC CONTAMINATED AIR

    SBC: Clyde Smith Engineer            Topic: N/A

    THE MOBILE ZONE DEVICE REPRESENTS ADVANCED WASTE REDUCTION TECHNOLOGY RATHER THAN A POLLUTION MANAGEMENT TECHNOLOGY. THE INNOVATIVE CONCEPT IS APPLICABLE TO VENTILATED WORK CHAMBERS WHERE THE VENTILATION IS PROVIDED FROM THE REMOVAL OF NOXIOUS FUMES AND/OR PARTICLES AND THE WORK CHAMBER IS PROVIDED FOR THE BENEFIT OF WORKER AND PRODUCT. THE MOST COMMON VENTILATED WORK CHAMBERS IN USE ARE SPRAY BOO ...

    SBIR Phase I 1989 Environmental Protection Agency
  8. SUPPRESSION OF CYANIDE FORMATION IN HALL PROCESS POTLINING

    SBC: EMEC Consultants            Topic: N/A

    N/A

    SBIR Phase I 1990 Environmental Protection Agency
  9. DEVELOPMENT OF A HIERARCHY FOR SOLVENT RECOVERY OF SELECTED ORGANICS FROM ACTIVATED CARBON (AC) AND FEASIBILITY OF A NEW REGENERATION OF SPENT AC

    SBC: PROFESSIONAL ANALYTICAL AND CONSULTING SERVICES INC            Topic: N/A

    THIS POTENTIAL NEW PROCESS FOR REGENERATION OF SPENT ACTIVATED CARBON (AC) IS BASED ON USING SUPERDESORBERS (SD) TO REMOVE AC ADSORBATES FOLLOWED BY SELECTIVE REMOVAL OF THESD. THIS PROCESS HAS POTENTIAL TO RECOVER AND REUSE AS ADSORBATES AND AC AND RECYCLE THE SD. NEEDED FEASIBILITY STUDIES ARE: LOAD AC WITH KNOWN ADSORBATES, USE SD TO DISPLACE AND RECOVER ADSORBATES FROM AS, QUANTITATE AND COMPA ...

    SBIR Phase I 1990 Environmental Protection Agency
  10. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government