SURFACTANT FLUSHING/WASHING--AN INNOVATIVE METHOD OF HAZARDOUS WASTE TREATMENT
SBC: Eckenfelder Inc. Topic: N/ATHE TECHNICAL OBJECTIVES OF THIS PROPOSAL ARE ORIENTED TOWARD THE DEVELOPMENT OF SOIL SURFACTANT FLUSHING AND WASHING AS A LOW-COST, LOW-IMPACT, LOW-RISK, EFFECTIVE TECHNIQUE FOR THE REMOVAL AND ULTIMATE DESTRUCTION OF THE ORGANIC CONTAMINANTS IN SOIL. THESE OBJECTIVES ARE: DEMONSTRATION OF THE EFFECTIVENESS OF AN IONIC SURFACTANT SOLUTION AT CONCENTRATIONS ABOVE THE CRITICAL MICELLE CONCENTRATION ...
SBIR Phase II 1990 Environmental Protection Agency -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/ATWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.
SBIR Phase II 1990 Nuclear Regulatory Commission -
Industrial Process Pollution Reduction by Development of Amorphous Biogenic Silica to Replace Fumed Silica
SBC: SioTeX Corporation Topic: 14NCER1AFumed silica is an important additive in many products, including paints, plastics and tires, and is a $1.5 billion market with a 6 percent growth rate. However, fumed silica producers rely on an energy- intensive, costly and hazardous process. The air pollution resulting from the energy utilized to produce fumed silica is a combination of carbon emissions from the production of raw materials, ene ...
SBIR Phase I 2015 Environmental Protection Agency -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
STEAM REFORMING OF MUNICIPAL WASTEWATER SLUDGE
SBC: Manufacturing And Technology Conversion Int'l, Inc Topic: N/ATHE MTIC INDIRECT STEAM REFORMING PROCESS OFFERS A COST EFFECTIVE ALTERNATIVE TO THE EXISTING WASTE-TO-ENERGY INCINERATION OF MUNICIPAL SLUDGE WASTE (MSW) OR REFUSE- DERIVED FUEL (RDF). THE PROCESS HAS THE POTENTIAL FOR RESOLVING MANY OF THE ENVIRONMENTAL ISSUES ASSOCIATED WITH INCINERATION, ESPECIALLY IN THE CONTROL OF CHLORINATED DIOXINS AND FURANS AS WELL AS EMISSIONS OF TOXIC METALS; PARTICULA ...
SBIR Phase I 1990 Environmental Protection Agency -
APPLICATION OF PULSE COMBUSTION IN SOLID AND HAZARDOUS WASTE INCINERATION
SBC: Sonotech Inc. Topic: N/AN/A
SBIR Phase I 1990 Environmental Protection Agency -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission