You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MERCURY-FREE HIGH CRI EFFICIENT LAMP

    SBC: Fusion Systems Corp.            Topic: N/A

    FUSION SYSTEMS HAS DEVELOPED A MERCURY-FREE, HIGH COLOR RENDERING, EFFICIENT LAMP USING PROPRIETARY BUT BENIGN LAMP FILLS. THEY PROPOSE TO INVESTIGATE VARIATIONS OF THE LAMP SYSTEM PARAMETERS WITH THE DUAL GIALS OF FURTHER INCREASING SYSTEM EFFICIENCY BY 1.5 X AND TO IMPROVE LAMP STARTING DOWN TO MINUS 40C. BOTH FACTORS ARE CRITICAL TOWARD ACHIEVING COMMERCIAL SUCCESS. THE NEW LAMP IS A MICROWAVE ...

    SBIR Phase II 1993 Environmental Protection Agency
  2. IMPROVED METHOD FOR HEATING CATALYTIC CONVERTERS OF VEHICLES TO ATTAIN ULTRA-LOW EMISSIONS

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Environmental Protection Agency
  3. STEAM REFORMING OF MUNICIPAL WASTEWATER SLUDGE

    SBC: Manufacturing And Technology Conversion Int'l, Inc            Topic: N/A

    THE MTIC INDIRECT STEAM REFORMING PROCESS OFFERS A COST EFFECTIVE ALTERNATIVE TO THE EXISTING WASTE-TO-ENERGY INCINERATION OF MUNICIPAL SLUDGE WASTE (MSW) OR REFUSE- DERIVED FUEL (RDF). THE PROCESS HAS THE POTENTIAL FOR RESOLVING MANY OF THE ENVIRONMENTAL ISSUES ASSOCIATED WITH INCINERATION, ESPECIALLY IN THE CONTROL OF CHLORINATED DIOXINS AND FURANS AS WELL AS EMISSIONS OF TOXIC METALS; PARTICULA ...

    SBIR Phase I 1990 Environmental Protection Agency
  4. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government