You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    N/A

    SBIR Phase I 2000 Environmental Protection Agency
  2. N/A

    SBC: E PAINT COMPANY            Topic: N/A

    N/A

    SBIR Phase I 2000 Environmental Protection Agency
  3. N/A

    SBC: KSE, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Environmental Protection Agency
  4. N/A

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Environmental Protection Agency
  5. N/A

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Environmental Protection Agency
  6. N/A

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Environmental Protection Agency
  7. WASTE REDUCTION THROUGH BENZENE-FREE POLYMERIZATION TECHNOLOGY

    SBC: KSE, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Environmental Protection Agency
  8. MERCURY-FREE HIGH CRI EFFICIENT LAMP

    SBC: Fusion Systems Corp.            Topic: N/A

    N/A

    SBIR Phase I 1992 Environmental Protection Agency
  9. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. RETROFIT PULSATING AFTER BURNER FOR EMISSION CONTROL FROM RESIDENTIAL WOOD STOVES

    SBC: Manufacturing And Technology Conversion Int'l, Inc            Topic: N/A

    THIS PROJECT IS FOCUSED UPON RESOLVING THE INCOMPLETE COMBUSTION PROBLEMS ENCOUNTERED IN RESIDENTIAL WOOD STOVES DUE TO LOW COMBUSTION TEMPERATURES, UNCONTROLLED AIR DRAFT RATES, VARIABILITY IN WOOD FUEL AND MOISTURE. A PROTOTYPE RETROFIT KIT IS TO BE FABRICATED AND TESTED TO DEMONSTRATE THE FEASIBILITY OF THE DEVICE AS AN INEXPENSIVE, EASILY INSTALLABLE AND OPERABLE EMISSIONS CONTROL DEVICE THAT ...

    SBIR Phase I 1992 Environmental Protection Agency
US Flag An Official Website of the United States Government