You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. IMPROVED METHOD FOR HEATING CATALYTIC CONVERTERS OF VEHICLES TO ATTAIN ULTRA-LOW EMISSIONS

    SBC: LYNNTECH INC.            Topic: AirQuality

    THE THREE-WAY CATALYTIC CONVERTER IS THE MOST IMPORTANT DEVICE MAKING TODAY'S AUTOMOBILES COMPLY WITH EXISTING EMISSION LAWS. THE FIRST TWO OR THREE MILES IN A TYPICAL 22-MINUTE, 12-MILE COMUTE IN TODAY'S VEHICLES RESULT IN THE EMISSION OF HALF OF THE TOTAL NON-METHANE HYDROCARBONS, WHICH RESULT IN THE PRODUCTION OF URBAN SMOG, AS WELL AS HALF OF THE TOXIC CO EMISSIONS. THIS OCCURS BECAUSE THE CAT ...

    SBIR Phase II 1994 Environmental Protection Agency
  2. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. Indoor Air Biocontamimant Control by Means of Combined Electrically Enhanced Filtration and OAUGDP Plasma Sterilization

    SBC: ENVIRONMENTAL ELEMENTS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1998 Environmental Protection Agency
  4. Development of a Multianalyte Biosensor Instrument

    SBC: Ergopedia, Inc.            Topic: N/A

    This Phase I project will develop a multianalyte biosensor field screening instrument (MBFI). The MBFI has the potential to reduce the annual cost of environmental analyses in the United States by more than $20 million and to reduce the analysis turnaround time from approximately 19 days to less than 15 minutes. The major barrier to the development of a biosensor instrument for environmental mea ...

    SBIR Phase II 1998 Environmental Protection Agency
  5. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. N/A

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Environmental Protection Agency
  8. N/A

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Environmental Protection Agency
  9. N/A

    SBC: LYNNTECH INC.            Topic: N/A

    Not Available The purpose of the proposed research is to show that significant improvements in the performance of electrically tunable microwave devices can be obtained using a novel type of superlattice structures. The approach is based on recent work at Neocera showi

    SBIR Phase I 2000 Environmental Protection Agency
  10. N/A

    SBC: LYNNTECH INC.            Topic: N/A

    Not Available NASA SBIR Solicitation 98-1 emphasizes that ¿Advanced extravehicular activity (EVA) systems are necessary for the successful support of future human space missions.¿ Topic 09.05 recognizes that development of advanced EVA systems depends on ¿methods for..

    SBIR Phase I 2000 Environmental Protection Agency
US Flag An Official Website of the United States Government