List
The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.
-
INTERGRATING FIBER OPTIC RADIATION DOSIMETER
SBC: Quantix Corp Topic: N/ATHE PROPOSED PROJECT WILL DEMONSTRATE THE FEASIBILITY OF EMPLOYING ELECTRON TRAPPING (ET) MATERIALS WITH FIBER OPTICS FILAMENTS FOR USE AS MICROPROBE RADIATION DOSIMETERS.THE ET MATERIALS TM CAN BE INTERROGATED BY NEAR-INFRARED TO PRODUCE VISIBLE OUTPUT SCALABLE TO RADIATION DOSES AT THE FIBER TIP. PHASE I WILL ASSESS THE PERFORMANCE OF SUCH MATERIALS AS MICROPORBE RADIATION DETECTORS INTEGRATED W ...
SBIR Phase II 1987 Nuclear Regulatory Commission -
ULTRA-TRACE ANALYSIS OF WATER AND WASTEWATER
SBC: Ionics International, Inc. Topic: N/AIONICS RESEARCH INC. (IRI) HAS DETERMINED THAT UNCOATED CAPILLARY COLUMNS CAN BE USED TO CONCENTRATE ORGANICS FROM WATER. THE METHOD IS EXCEEDINGLY SIMPLE AND RAPID (10 MINUTES PER 100 ML), YET EFFECTIVE. IRI PLANS TO INVESTIGATE THE POTENTIAL OF THIS TECHNIQUE FOR THE DEVELOPMENT OF AN INSTRUMENT SUITABLE FOR THA NALYSIS OF ORGANICS AT THE PART-PER-TRILLION LEVEL IN WATER AND WASTEWATER. SUCH AN ...
SBIR Phase II 1987 Environmental Protection Agency -
ECONOMIC REMOVAL OF HYDROGEN SULFIDE FRM NATURAL GAS AND OIL
SBC: Oaks Travel Inc. Topic: N/ATHIS PROPOSAL IS CONCERNED WITH THE ECONOMIC REMOVAL OF HYDROGEN SULFIDE, A TOXIC MATERIAL, FROM SOUR NATURAL GAS AND PETROLEUM PRODUCTS. THE CURRENT STATUS OF H2S PROCESSING IS REVIEWED. THE CHEMISTRY OF SULFUR AND SULFIDE IN AQUEOUS SOLUTIONS AND PRELIMINARY WORK ALREADY CARRIED OUT IN THE CONTINUOUS ELECTROLYSIS OF H2S TO YIELD HYDROGEN AND SULFUR ARE BRIEFLYDISCUSSED. THE ESTIMATED ECONOMIC GA ...
SBIR Phase II 1987 Environmental Protection Agency -
Monitoring Groundwater Contaminants
SBC: Lynntech Inc. Topic: N/AChlorinated hydrocarbons represent the most prevalent contaminants in the subsurface, threatening the quality of groundwater at aquifers. Existing technologies for monitoring these contaminants require expensive, labor-intensive methods of sample collection and analysis. The goal of this Phase I research project is to develop a low-cost, compact, reliable, automated, unattended, and long-term mo ...
SBIR Phase I 2004 Environmental Protection Agency -
Monitoring Groundwater Contaminants
SBC: Lynntech Inc. Topic: C3NCERD1Chlorinated hydrocarbons represent the most prevalent contaminants in the subsurface, threatening the quality of groundwater at aquifers. Existing technologies for monitoring these contaminants require expensive, labor-intensive methods of sample collection and analysis. The goal of this Phase I research project is to develop a low-cost, compact, reliable, automated, unattended, and lo ...
SBIR Phase I 2004 Environmental Protection Agency -
Fluorescent Nanoparticle-Aptmer-Magnetic Bead Sensor for Bioterrorism Detection in Water
SBC: Operational Techologies Corporation Topic: N/ASome bioterrorism agents cause disease at very low infective doses and their presence can be masked by the environment. Therefore, ultrasensitive detection is required for homeland defense applications. In this Phase I research project, Operational Technologies Corporation (OpTech) proposes to couple DNA aptamers made by the Systematic Evolution of Ligands by Exponential Enrichment (SELEX) proce ...
SBIR Phase I 2004 Environmental Protection Agency -
Fluorescent Nanoparticle-Aptamer-Magnetic Bead Sensor for Bioterrorism Detection in Water
SBC: Operational Techologies Corporation Topic: C3NCERB4Some bioterrorism agents cause disease at very low infective doses and their presence can be masked by the environment. Therefore, ultrasensitive detection is required for homeland defense applications. In this Phase I research project, Operational Technologies Corporation (OpTech) proposes to couple DNA aptamers made by the Systematic Evolution of Ligands by Exponential Enrichment (SE ...
SBIR Phase I 2004 Environmental Protection Agency -
PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS
SBC: KALSI ENGINEERING, INCORPORATED Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission -
ELECTROTHERMAL REFORMING OF HAZARDOUS ORGANICS AND WATER- SOLUBLE WASTES
SBC: A1-chem Fuels Inc. Topic: N/AN/A
SBIR Phase I 1987 Environmental Protection Agency -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission