You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Tightly Coupled Oscillator and GPS Receiver

    SBC: Jackson Labs Technologies, Inc.            Topic: A17051

    Legacy GPS receivers do not make use of the disciplined atomic oscillator flywheel output in GPS Disciplined Oscillator systems. The attached proposal shows how the disciplined oscillator signal can be used to improve GPS carrier and code tracking, mitigate multipath, jamming and spoofing, and to detect GPS receiver and satellite system anomalies. Using the disciplined oscillator as the frequency ...

    SBIR Phase I 2018 Department of DefenseArmy
  2. Tightly Coupled Oscillator and GPS Receiver

    SBC: Jackson Labs Technologies, Inc.            Topic: A17051

    GPS Disciplined Oscillator (GPSDO) systems traditionally combine the 1PPS output from a GPS receiver and highly stable clock like a Chip Scale Atomic Clock (CSAC) to steer the local clock frequency to match the frequency and phase of the GPS-generated 1PPS. However, the GPS receiver does not take advantage of the stable Chip Scale Atomic Clock for improved GPS receiver resilience, improved positio ...

    SBIR Phase II 2018 Department of DefenseArmy
  3. Non-Pyro Electric Small Arms Fire Simulator

    SBC: Digital Solid State Propulsion, Inc            Topic: A18091

    Digital Solid State Propulsion Inc. is proposing the development of a reusable electric blank system that leverages over 10 years of success in formulating, engineering, and manufacturing Electric Solid Propellants for the space, defense, and entertainment industries. DSSP already has a pyrotechnic solution to battlefield effects simulating small arms fire based on eSquib technology, however, for ...

    SBIR Phase I 2018 Department of DefenseArmy
  4. Heat Actuated Cooling System

    SBC: Rocky Research            Topic: A09090

    The principal objective of this effort is to develop an advanced complex compound for ammonia-solid absorption chillers and demonstrate the enhanced sorbent for a 18,000 BTU/hr technology demonstrator in the Phase II effort. Phase I experimental data showed that it is feasible to make a fuel-fired sorption cooling system capable of 18,000 Btu/hr cooling and 105 kg dry-weight with 0.34 gal/hr of JP ...

    SBIR Phase II 2012 Department of DefenseArmy
  5. High Efficiency Mobile Ice Maker (HEMIM)

    SBC: Rocky Research            Topic: A10164

    Proposed is the continuation of development of a High Efficiency Mobile Ice Maker (HEMIM) for the Army that is capable of integrating DC power from solar PV cells. The proposed ice maker will include a variable capacity vapor compression system with variable air flow as per ambient temperatures. The Performance of the high efficiency cycle will be enhanced by the use of advanced variable speed dri ...

    SBIR Phase II 2012 Department of DefenseArmy
US Flag An Official Website of the United States Government