List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Formulation and testing of an entirely wood-based exterior insulation board for the high-performance building market

    SBC: GO Lab Inc.            Topic: 17NCER6B

    The goal of this project is the formulation a rigid, insulating, low-density wood composite, with physical and thermal properties comparable to fossil fuel derived foams. _x000D_ _x000D_ To achieve energy conservation standards mandated by certification agencies such as Passive House and LEED, high performance buildings require multiple shells of insulation – an inner shell that contains electri ...

    SBIR Phase I 2018 Environmental Protection Agency
  2. Non-Pneumatic Tire for On-Highway and Off-Road Mobility

    SBC: INDIANA TOOL & MFG. CO., INC.            Topic: A18101

    The purpose of this proposal is to demonstrate the feasibility, through modeling and simulation, of integrating engineered polyhedral Phase Transforming Cellular Matrix (PXCM) materials as a dynamic, elastically deformable solution for non-pneumatic tires that can; 1) resist loss of mobility due to hazards that include ballistic/explosive threats, and road debris, 2) extend capability allowing the ...

    SBIR Phase I 2018 Department of DefenseArmy
  3. Development of a Modular, Open-Architecture, Integrated, and Validated Mobility Prediction Capability

    SBC: Advanced Science And Automation Corp            Topic: A18105

    The objective of this project is to develop a modular, open-architecture, physics-based ground vehicle mobility prediction software tool for world-wide terrains that are encountered in military applications including on-road and off-road soft soil terrains. The tool will integrate three modules: (1) Physics-Based Vehicle-Terrain Modeling tool; (2) Geographic Information System (GIS); and (3) Stoch ...

    SBIR Phase I 2018 Department of DefenseArmy
  4. Gallium Nitride (GaN) based 28 VDC Circuit Protection and Distribution

    SBC: PC Krause And Associates, Inc.            Topic: A16087

    Recent advances in commercially available Gallium Nitride (GaN) MOSFETS offer significant advantages compared to traditional Silicon devices for circuit protection and power distribution applications including the availability of devices in advanced packaging options, lower on-state resistances, and improved performance in harsh electromagnetic environments.To demonstrate these advantages of GaN i ...

    SBIR Phase II 2018 Department of DefenseArmy
  5. A Pollution Free Aerosol Dispenser

    SBC: En'urga Inc.            Topic: N/A

    This project involves the development of a consumer aerosol dispenser that seeks to eliminate the volatile organic compound (VOC) solvents and hydrocarbon (HC) propellants used in many commercial sprays. The two distinguishing features of the dispenser are: (1) application of ligament-controlled effervescent atomization for producing very small droplets independent of the fluid viscosity, and (2) ...

    SBIR Phase I 2001 Environmental Protection Agency
  6. Advanced Military Diesel Engine, High Temperature Tribology

    SBC: ADIABATICS INCORPORATED            Topic: N/A

    Adiabatics, Inc. has been involved in the field of ceramic composite coatings and high temperature uncooled Low Heat Rejection (LHR) diesel engine development for the past 15 years. Recent developments in previous high temperature tribology study has shednew light on the possiblity of coming up with a viable solution for the high temperature tribology puzzle.Adiabatics' proposes a 3

    SBIR Phase I 2001 Department of DefenseArmy
  7. Lifetime Filtration for Military Vehicles

    SBC: ANALYTICAL ENGINEERING, INC.            Topic: N/A

    This program will eliminate all lubrication oil and oil filter replacement in the HMMWV and FMTV for the entire vehicle service life. This will be accomplished by delivering to the US Army a retrofit lubrication filter, immediately compatible withexisting hardware, which will install and operate in the existing envelope, provide superior full flow filtration to existing filters, be factory fit or ...

    SBIR Phase I 2001 Department of DefenseArmy
  8. Hybrid Tailored Preform for Limited Life Airframe Structures

    SBC: Pepin Associates Inc            Topic: N/A

    This Phase II program seeks to develop a low cost high performance keel for the Boeing Unmanned Combat Air Vehicle (UCAV). The preforming concept is based upon a commingled tow, which contains long discontinuous structural filaments allowing the two tostretch in its reinforcement direction. When the CD Tow is woven into a preform, the preform itself can be easily shaped before or during molding. ...

    SBIR Phase II 2001 Department of DefenseDefense Advanced Research Projects Agency
  9. Hybrid Tailored Preform for Limited Life Airframe Structures

    SBC: Pepin Associates Inc            Topic: N/A

    This Phase II program seeks to develop a low cost high performance keel for the Boeing Unmanned Combat Air Vehicle (UCAV). The preforming concept is based upon a commingled tow, which contains long discontinuous structural filaments allowing the two tostretch in its reinforcement direction. When the CD Tow is woven into a preform, the preform itself can be easily shaped before or during molding. ...

    SBIR Phase I 2001 Department of DefenseDefense Advanced Research Projects Agency

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government