You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. StopBot

    SBC: CYBER DEFENSE AGENCY, LLC            Topic: N/A

    Cyber Defense Agency, LLC (CDA) proposes to develop StopBot, a unique, multi-modal security application that will detect botnets and disable their command and control systems. StopBot will have three different modes of operation: a free, stand-alone mode to protect individual end systems, a subscription mode in which results from individual end systems are collected securely and correlated to gene ...

    SBIR Phase I 2006 Department of Homeland Security
  2. Vertical Wind Profile Data Collection Using Laser Technology on Unmanned Delivery Platforms.

    SBC: OCEANIT LABORATORIES INC            Topic: SOCOM04007

    The current project will develop and demonstrate a prototype compact, power-efficient all-fiber lidar unit for wind profiling on board UAV's and other aircraft. The system leverages Oceanit's current fiber-laser based lidar development efforts. A unique design provides a rugged system with no moving parts and little maintenance requirements. Efforts in the current project will include prototype s ...

    SBIR Phase II 2006 Department of DefenseSpecial Operations Command
  3. High Quantum Efficiency Fast Detectors for Readout of Scintillators for Gamma Ray Detection

    SBC: VOXTEL, INC.            Topic: HSB062007

    High quantum efficiency (QE), fast (

    SBIR Phase I 2006 Department of Homeland Security
  4. ANALYSIS OF STATE-OF-THE-ART METHODS FOR CONTAINMENT INTEGRATED LEAK RATE TESTING

    SBC: Sentry Equipment Corp.            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government