You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SBIR Phase II: Automation Enabled, Low-Cost, High-Volume Production of Advanced Composites
SBC: Vistex Composites, LLC Topic: NMThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project is in the automated manufacture of lightweight high-strength carbon fiber composite materials. Experts agree that composite manufacturers must lead innovations in sustainability, price reduction, and cycle-time reduction to meet end-market needs. The innovations proposed in this project, coup ...
SBIR Phase II 2015 National Science Foundation -
Modular Addressable Research Irradiator using Flat Panel X-ray Sources
SBC: STELLARRAY INC Topic: 02b"The National Academy of Sciences issued a report in February 2008 detailing isotope replacement priorities in the interests of national security [National Research Council, 2008] . 137Cs used in “self-contained” irradiators was identified as the single most dangerous isotope in the inventory, owing to its long half life 30+ years) and production as cesium chloride salt, which me ...
SBIR Phase II 2015 Department of Energy -
SBIR Phase II: A Multi-Modality Sensing Approach for the Objective Assessment of Agitation and Sedation
SBC: AUTONOMOUS HEALTHCARE INC Topic: BCThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project involves advancements in the state-of-the-art in biomedical technology, improvement of the quality of care for intensive care unit (ICU) patients, and a reduction in healthcare costs. The proposed agitation and sedation system will assist in realizing an improved distribution of ICU workload ...
SBIR Phase II 2015 National Science Foundation -
SBIR Phase II: Development of a Microscope to Detect Cellular Motion in Three-dimensional Tissue
SBC: ANIMATED DYNAMICS, INC Topic: BCThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project is to develop a new microscope that integrates biodynamic imaging with conventional phase contrast microscopy for use in drug development and other research applications. Accurately capturing the signatures of three-dimensional biological systems provides more realistic measures of drug effic ...
SBIR Phase II 2015 National Science Foundation -
SBIR Phase II: Nondestructive/noninvasive three-dimensional imaging with Gabor-domain optical coherence microscopy
SBC: LighTopTech Corp. Topic: MNThis Small Business Innovation Research (SBIR) Phase II project will explore the applicability of a Gabor-domain optical coherence microscopy (GD-OCM) instrument to image and evaluate optical materials as part of the manufacturing process. The immediate broader impact of this project is to effectively provide both qualitative and quantitative information about product quality in manufacturing, wit ...
SBIR Phase II 2015 National Science Foundation -
SBIR Phase II: Resource-efficient Remote Monitoring and Diagnostics for Cyber-Physical Systems
SBC: Sensorhound, Inc Topic: EIThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project derives from the fact that increasing the reliability and robustness of cyber-physical systems (CPSs) will directly increase their adoption in real world applications. CPS technology is directly applicable to a broad range of sectors, including utility grids, smart buildings, manufacturing, h ...
SBIR Phase II 2015 National Science Foundation -
SBIR Phase II: Translational Information Management for Industry
SBC: i2k Connect LLC Topic: EIThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project will be more effective and efficient use of unstructured data. Limiting analysis to structured data ignores the massive amount of information in reports, memos, articles, and other written documents. Workers require information on past work and ongoing projects, best practices, current events ...
SBIR Phase II 2015 National Science Foundation -
SBIR Phase II: Smart Solar Control Film
SBC: DIMIEN INC Topic: NMThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project will reduce energy consumption in buildings and automobiles via 'smart' solar control window films. The effects of solar heating are frequently experienced on sunny warm days when the inside temperature of a car can exceed 130°F in minutes. The same solar heating that is such a nuisance in s ...
SBIR Phase II 2015 National Science Foundation -
Transmission Incipient Detection & Fault Location- TID&FL
SBC: UNDERGROUND SYSTEMS INC Topic: 22aIn order to optimize the operating efficiency of transmission systems utilities must be able to quickly restore service after a failure. Locating faults with current technologies can be a time consuming, skill and labor intensive process. Underground transmission systems are hidden from view and fault location can take sometimes days or weeks. Detecting and locating incipient faults prior to fail ...
SBIR Phase II 2015 Department of Energy -
Web-Based Computational Model Builder for Nuclear Energy Advanced Modeling and Simulation
SBC: KITWARE INC Topic: 19dAccording to the World Nuclear Association, the U.S. is the largest producer of nuclear power worldwide. In fact, the U.S. provides over 30 percent of the worlds nuclear generation of electricity. Although few new reactors have been built in the past 30 years, the association anticipates that four to six reactors may be built by 2020. The first of the reactors will be built in response to 16 licen ...
SBIR Phase II 2015 Department of Energy