You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
3D Tip Characterization and Surface Reconstruction
SBC: Nanometrology International, Inc. Topic: 9070168TTNanometrology International, Inc. (NMI) proposes to demonstrate the feasibility of 3-dimensional (3D) characterization of nanoscale objects using scanning probe microscopy (SPM) with a measurement uncertainty of less than 0.7 nm. To accomplish this task, we propose a novel method of 3D tip characterization and use of an innovative surface reconstruction algorithm recently introduced by NIST and th ...
SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology -
Technology Transfer of Multimodal Biometric Application Resource Kit (MBARK)
SBC: Ad Harmony Topic: N/AThe technical objective of this project is to develop a prototype of a face recognition application in a cloud computing environment utilizing MBARK as the middleware. The application will have a client piece that will run on a mobile device such as a laptop and a server piece that will run on a higher-performance computing cluster. The specific objectives of this development project can be enumer ...
SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology -
Analysis of New WWVB Modulation Schemes for Future Broadcast
SBC: XW, LLC dba Xtendwave Topic: N/AThis Phase 2 project targets the completion of the development of an improved system for the broadcasting of the WWVB signal, as a direct continuation of the Phase 1 project, which successfully validated the proposed approach through a feasibility study and analyses. Objectives of this project include the design of the new modulation scheme and protocol, the development of a new time-code generato ...
SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology -
Laser-Assisted Maching for PAC-3 Missle Radomes
SBC: CREARE LLC Topic: DLA10001Structural ceramics are desirable for high-performance missile radomes due to their excellent strength-to-weight ratio and their ability to withstand high temperatures. Currently, the only way to machine silicon nitride to the tolerances and quality required involves a time-consuming and expensive diamond grinding process that can induce
SBIR Phase I 2011 Department of DefenseDefense Logistics Agency -
Scale up of HVD parylene HT deposition process for economic continuous production of magnet wire
SBC: AERODYN ENGINEERING, INC. Topic: DLA10001The highest available operating temperature for magnet wire is 240 degrees C. As electromagnetic performance is directly related to the density of winding turns times the operating current, the maximum operating temperature of magnet wire is the largest single constraint to advancements in high performance and high temperature electronics. It
SBIR Phase I 2011 Department of DefenseDefense Logistics Agency -
Advanced Technologies for Discrete-Parts Manufacturing
SBC: ADVANCED POWDER SOLUTIONS INC Topic: DLA08001SD
SBIR Phase II 2011 Department of DefenseDefense Logistics Agency -
A Cryogenic Grinding System for the High Productivity Grinding of Advanced Materials
SBC: CREARE LLC Topic: DLA09001High performance metals, ceramics, and hard coatings are used in military applications to enhance the performance of key systems needed by the warfighter. One of the most prevalent operations to remove material, achieve the desired surface finish, or enhance part quality is bulk and finish grinding. For typical cutting speeds, conventional synthetic or oil-based coolants are sufficient to remove ...
SBIR Phase II 2011 Department of DefenseDefense Logistics Agency