You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Technology Transfer of Multimodal Biometric Application Resource Kit (MBARK)

    SBC: Ad Harmony            Topic: N/A

    The technical objective of this project is to develop a prototype of a face recognition application in a cloud computing environment utilizing MBARK as the middleware. The application will have a client piece that will run on a mobile device such as a laptop and a server piece that will run on a higher-performance computing cluster. The specific objectives of this development project can be enumer ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  2. Decision Support Tools for Sustainable Manufacturing

    SBC: BIMCON Inc.            Topic: 907012R

    Our vision is that of an integrated decision support solution that transforms the current time-consuming and reactive (post-design) sustainability assessment of a product into a proactive approach available in the early design phases. This solution called Sustainability Integrated into Early Design (SIED) will deliver lifecycle sustainability data into early design processes and focus primarily on ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  3. Analysis of New WWVB Modulation Schemes for Future Broadcast

    SBC: XW, LLC dba Xtendwave            Topic: N/A

    This Phase 2 project targets the completion of the development of an improved system for the broadcasting of the WWVB signal, as a direct continuation of the Phase 1 project, which successfully validated the proposed approach through a feasibility study and analyses. Objectives of this project include the design of the new modulation scheme and protocol, the development of a new time-code generato ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  4. 3D Tip Characterization and Surface Reconstruction

    SBC: Nanometrology International, Inc.            Topic: 9070168TT

    Nanometrology International, Inc. (NMI) proposes to demonstrate the feasibility of 3-dimensional (3D) characterization of nanoscale objects using scanning probe microscopy (SPM) with a measurement uncertainty of less than 0.7 nm. To accomplish this task, we propose a novel method of 3D tip characterization and use of an innovative surface reconstruction algorithm recently introduced by NIST and th ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  5. An Integrated Decision Support Framework for Sustainability CAE

    SBC: BIMCON Inc.            Topic: 9050273R

    The objective of this proposal is to establish the feasibility of developing an integrated decision support framework that transforms the current time-consuming and reactive (post completion of final design) sustainability assessment into a proactive CAE approach that enables the ability to revise designs based on performance against selected sustainability targets in the product design process, i ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  6. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government