You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Analysis of New WWVB Modulation Schemes for Future Broadcast
SBC: XW, LLC dba Xtendwave Topic: N/AThis Phase 2 project targets the completion of the development of an improved system for the broadcasting of the WWVB signal, as a direct continuation of the Phase 1 project, which successfully validated the proposed approach through a feasibility study and analyses. Objectives of this project include the design of the new modulation scheme and protocol, the development of a new time-code generato ...
SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology -
Automated SCAP Tool Validator (ASTV)
SBC: ATC-NY INC Topic: 9010377RThe current testing methods of the NIST Security Content Automation Protocol (SCAP) Validation Program are largely manual and labor-intensive, making comprehensive validation of SCAP-enabled IT security products difficult and time-consuming. ATC-NY will design and develop the Automated SCAP Tool Validator (ASTV) for use with the SCAP Public Validation Test Suite and others. ASTV automates the conf ...
SBIR Phase I 2013 Department of CommerceNational Institute of Standards and Technology -
Cost Competitive Wave Energy Without Moving Parts
SBC: OSCILLA POWER INC Topic: 815Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...
SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration -
Development of a non-destructive, quantitative residual stress assessment tool
SBC: Generation 2 Materials Technology Llc Topic: 111PH2A nondestructive tool will be developed to quatitatively assess residual stress in pipelines from the exterior and through coatings. Residual stress is a critical factor that determines the cracking susceptibility of pipeline steels, but existing methods for measuring mechanical damage in pipeline steels are incapable of quantifying the residual stress levels. A larger gouge or dent does not nec ...
SBIR Phase I 2011 Department of Transportation -
3D Tip Characterization and Surface Reconstruction
SBC: Nanometrology International, Inc. Topic: 9070168TTNanometrology International, Inc. (NMI) proposes to demonstrate the feasibility of 3-dimensional (3D) characterization of nanoscale objects using scanning probe microscopy (SPM) with a measurement uncertainty of less than 0.7 nm. To accomplish this task, we propose a novel method of 3D tip characterization and use of an innovative surface reconstruction algorithm recently introduced by NIST and th ...
SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology -
Improved Decision Support Tools for State of Good Repair
SBC: TWILIGHT TRAINING, L.L.C. Topic: 131FT2Every asset ages. Pipes, roads, computers, cars, etc. This fact is inevitable. And, as a result of the aging process, every asset suffers a degradation in its intended capability or performance over time. Yet every day, millions of people in the U.S. get up in the morning expecting that they will be able to travel to work, drink clean water, use the Internet, and so on. It usually takes a catastro ...
SBIR Phase I 2013 Department of Transportation -
Intelligent Dimension Evaluation and Alerting System (IDEAS)
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 111FH3International Electronic Machines (IEM) Corp. will develop the Intelligent Dimension Evaluation and Alerting System, or IDEAS. In Phase I, IEM will examine two different approaches for achieving the goal of accurate, reliable dimensioning and classification of moving vehicles at highway speeds. IDEAS will leverage prior work by IEM for the Federal Railroad Administration (FRA), New York State
SBIR Phase I 2011 Department of Transportation -
Long Term Behavior, Failure Analysis & In-Service Testing of Composite Cylinders
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: 101PH1TRI proposes to develop reliable methodology and protocols for in-service inspection,recertifying and retiring DOT COPVs to maximize service life while ensuring personnel safety. This method must be sufficiently robust to prevent in-service failures, while being straightforward and affordable enough to be conducted at cylinder recertification facilities. To accomplish this with a high degree of co ...
SBIR Phase I 2011 Department of Transportation -
Smart Grade Crossing Monitor System
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 101FR2During Phase I, IEM developed a proof of concept for a Smart Grade Crossing Monitor (SGCM) using multispectral imaging technology for enhanced monitoring of highway rail grade crossings to improve safety by providing warnings of significant objects present in the crossing. The Phase I work conclusively demonstrated that multispectral imaging is clearly superior to visible or infrared spectrum imag ...
SBIR Phase II 2011 Department of Transportation -
Technology Transfer of Multimodal Biometric Application Resource Kit (MBARK)
SBC: Ad Harmony Topic: N/AThe technical objective of this project is to develop a prototype of a face recognition application in a cloud computing environment utilizing MBARK as the middleware. The application will have a client piece that will run on a mobile device such as a laptop and a server piece that will run on a higher-performance computing cluster. The specific objectives of this development project can be enumer ...
SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology