You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. Client-Centered Calibration of the NOAA Climate Forecast System

    SBC: PRESCIENT WEATHER LTD            Topic: 821C

    Prescient Weather proposes four Phase I tasks to increase the value of the new NOAA Climate Forecast System to commercial customers. The capabilities demonstrated and explored in Phase I will be developed and integrated in Phase II as components of a new Seasonal Information and Decision Support System (SIDSS) for our World Climate Service customers. The Phase I tasks are: • Improve season for ...

    SBIR Phase I 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Combined Extinction/Flourescence Absorption Diagnostics for Pharmaceutical Sprays

    SBC: En'urga Inc.            Topic: 9030163R

    This Phase I project will evaluate the feasibility of a pharmaceutical spray quality audit system. The spray quality audit system will estimate the mass distribution of active ingredients and droplet sizes in pharmaceutical sprays using combined fluorescence absorption and light extinction tomography. En’Urga will modify an existing instrument to simultaneously obtain full volume fluorescence ab ...

    SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology
  4. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. 3D Tip Characterization and Surface Reconstruction

    SBC: Nanometrology International, Inc.            Topic: 9070168TT

    Nanometrology International, Inc. (NMI) proposes to demonstrate the feasibility of 3-dimensional (3D) characterization of nanoscale objects using scanning probe microscopy (SPM) with a measurement uncertainty of less than 0.7 nm. To accomplish this task, we propose a novel method of 3D tip characterization and use of an innovative surface reconstruction algorithm recently introduced by NIST and th ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  6. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. Production of NIST/UCSF Breast Phantom for Magnetic Resonance Imagaing (MRI)

    SBC: Phantom Laboratory            Topic: N/A

    his project involves the commercialization of the breast phantom designed by NIST and University of California, San Francisco (UCSF) for quantitative magnetic resonance imaging (MRI). The breast phantom consists of two independent phantoms, one focused on diffusion MRI measurements and the other focused on accurate measurements of fat and fibroglandular tissue properties. The proposed phantom is o ...

    SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology
  8. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. 120-X-2 Unmanned Aircraft System-Borne Atmospheric & Sea Surface Temperature (SST) Sensing

    SBC: PIASECKI AIRCRAFT CORP            Topic: 84

    To capture critical weather and SST data in the Tropical Cyclone Boundary Layer (TCBL), Piasecki Aircraft proposes to evaluate existing meteorological sensor packages, integrate new off-the-shelf MEMS sensors, and design an air-launched UAS to improve the resolution of observations captured in the TCBL. Capturing latent and sensible heat fluxes can be achieved reliably with a powered UAS (compare ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government