Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. 3D Tip Characterization and Surface Reconstruction

    SBC: Nanometrology International, Inc.            Topic: 9070168TT

    Nanometrology International, Inc. (NMI) proposes to demonstrate the feasibility of 3-dimensional (3D) characterization of nanoscale objects using scanning probe microscopy (SPM) with a measurement uncertainty of less than 0.7 nm. To accomplish this task, we propose a novel method of 3D tip characterization and use of an innovative surface reconstruction algorithm recently introduced by NIST and th ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  2. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. Combined Extinction/Flourescence Absorption Diagnostics for Pharmaceutical Sprays

    SBC: En'urga Inc.            Topic: 9030163R

    This Phase I project will evaluate the feasibility of a pharmaceutical spray quality audit system. The spray quality audit system will estimate the mass distribution of active ingredients and droplet sizes in pharmaceutical sprays using combined fluorescence absorption and light extinction tomography. En’Urga will modify an existing instrument to simultaneously obtain full volume fluorescence ab ...

    SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology
  4. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. Production of NIST/UCSF Breast Phantom for Magnetic Resonance Imagaing (MRI)

    SBC: Phantom Laboratory            Topic: N/A

    his project involves the commercialization of the breast phantom designed by NIST and University of California, San Francisco (UCSF) for quantitative magnetic resonance imaging (MRI). The breast phantom consists of two independent phantoms, one focused on diffusion MRI measurements and the other focused on accurate measurements of fat and fibroglandular tissue properties. The proposed phantom is o ...

    SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology
  7. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government