You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Compact Visual-Odometry Sensor for UGVs
SBC: Traclabs Inc. Topic: A09203This is a proposal to design a compact visual odometry sensor that can be mounted on unmanned ground vehicles. Visual odometry (VO) is a technique that estimates the ego-motion from images perceived by moving cameras. A self-contained visual odometry sensor would provide several significant benefits to unmanned ground vehicles, including: 1) providing position information to platforms that do not ...
SBIR Phase II 2011 Department of DefenseArmy -
Adjustable Autonomy for Intelligent Operation of Mobile Manipulators
SBC: Traclabs Inc. Topic: A11aT032In recent years, the military has been integrating robotic systems into tasks previously performed entirely manually by soldiers. Examples include explosive ordnance disposal (EOD), surveillance and reconnaissance, urban search and rescue (USAR), chemical, biological, and nuclear (CBN) operations, and medical assistance and evacuation. A typical application is for a soldier (remote operator) to te ...
STTR Phase I 2011 Department of DefenseArmy -
ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS
SBC: Information Research Topic: N/ATHE TECHNICAL OBJECTIVE OF THIS PROJECT IS TO ESTABLISH THE FEASILBILITY OF SATISFYING THE REQUIREMENTS OF THE U.S. ARMY COMMUNICATIONS ELECTRONICS COMMAND (CECOM) FOR RAPID AND EFFECTIVE MODELING OF U.S. ARMY COMMUNICATION SYSTEMS. THE METHOD WE PROPOSE FOR SATISFYING THESE REQUIREMENTS IS TO ADAPT A TOP-DOWN DESIGN SYSTEM FOR ELECTRONIC SYSTEMS BEING DEVELOPED FOR THE U.S. NAVY TO MODEL-ING OF C ...
SBIR Phase I 1987 Department of DefenseArmy -
Advanced low-power personnel/vehicle detecting radar for smart unattended ground sensor/munition systems
SBC: Mustang Technology Group, L.P. Topic: A09113As an essential part of the roadmap to develop an ultra low power radar system, Mustang Technology Group proposes to design, fabricate and test circuit boards that demonstrate a reduction in power of the current VIPER radar by more than half.
SBIR Phase II 2011 Department of DefenseArmy -
Advanced Molded Glass Lenses
SBC: Rochester Precision Optics, LLC Topic: A10020There is a critical need for lighter, smaller, inexpensive, and higher performance optical components in many military programs such as Thermal Weapon Sight (TWS), Enhanced Night Vision Goggle (ENVG), Monocular Night Vision Device (MNVD), Aviators Night Vision Imaging System (ANVIS), Sniper Night Sight (SNS), Clip-on Sniper Night Sight, and Lightweight Laser Designator Rangefinder (LLDR). Precisio ...
SBIR Phase II 2011 Department of DefenseArmy -
Advanced Rotary Diesel Engine Fuel Injection System for Unmanned and Manned Ground Vehicles
SBC: L.K. Industries, Inc. Topic: A11064This proposal consists of developing and demonstrating an advanced, high pressure, fuel injection system for the rotary engine for aerospace and/or ground application. The intent is to develop an advanced fuel injection system so that the rotary engine can run on heavy fuel (diesel, DF-2 or JP-8). We will investigate the use of piezo-actuators due to their response time and hence their precision ...
SBIR Phase I 2011 Department of DefenseArmy -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
AN ACELLULAR RESUSCITATIVE FLUID
SBC: Microfoam Inc Topic: N/ADURING THE PAST SEVERAL YEARS, GREAT ADVANCES HAVE BEEN MADE TOWARD THE GOAL OF PRODUCING AN OXYGEN-CARRYING RESUSCITATIVE FLUID, COMMONLY CALLED ARTIFICIAL BLOOD SUBSTITUTE. FROM THE PRELIMINARY STUDIES IN THIS LABORATORY, IT APPEARS FEASIBLE TO SYNTHESIZE A SUITABLE SUBSTANCE IN FREEZE-DRIED FORM. THE ARTIFICIAL BLOOD PROPOSED IN THIS INVESTIGATION CAN BE PRODUCED FROM A STABLIZED TETRAMERIC HEM ...
SBIR Phase I 1987 Department of DefenseArmy -
Analysis of New WWVB Modulation Schemes for Future Broadcast
SBC: XW, LLC dba Xtendwave Topic: N/AThis Phase 2 project targets the completion of the development of an improved system for the broadcasting of the WWVB signal, as a direct continuation of the Phase 1 project, which successfully validated the proposed approach through a feasibility study and analyses. Objectives of this project include the design of the new modulation scheme and protocol, the development of a new time-code generato ...
SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology -
AN ORDNANCE FUZE POWER SOURCE ASSEMBLED FROM COMMERCIALLY AVAILABLE BATTERIES
SBC: VMS CONSULTING ENGINEERS Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy