You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. Analysis of New WWVB Modulation Schemes for Future Broadcast

    SBC: XW, LLC dba Xtendwave            Topic: N/A

    This Phase 2 project targets the completion of the development of an improved system for the broadcasting of the WWVB signal, as a direct continuation of the Phase 1 project, which successfully validated the proposed approach through a feasibility study and analyses. Objectives of this project include the design of the new modulation scheme and protocol, the development of a new time-code generato ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  3. Automated Detection of Whale Blows in Infrared Video

    SBC: SONALYSTS INC            Topic: 816F

    The gray whale migration generates many hours of video that must be examined carefully to identify passing whales and get an accurate count of their numbers. Unfortunately, humans lack the necessary attention span. To solve this problem, a detector will be developed that can process hours of video, detecting whale blows while minimizing false positives and negatives. With an accurate record of ...

    SBIR Phase I 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  4. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. 3D Tip Characterization and Surface Reconstruction

    SBC: Nanometrology International, Inc.            Topic: 9070168TT

    Nanometrology International, Inc. (NMI) proposes to demonstrate the feasibility of 3-dimensional (3D) characterization of nanoscale objects using scanning probe microscopy (SPM) with a measurement uncertainty of less than 0.7 nm. To accomplish this task, we propose a novel method of 3D tip characterization and use of an innovative surface reconstruction algorithm recently introduced by NIST and th ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  6. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  8. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. Technology Transfer of Multimodal Biometric Application Resource Kit (MBARK)

    SBC: Ad Harmony            Topic: N/A

    The technical objective of this project is to develop a prototype of a face recognition application in a cloud computing environment utilizing MBARK as the middleware. The application will have a client piece that will run on a mobile device such as a laptop and a server piece that will run on a higher-performance computing cluster. The specific objectives of this development project can be enumer ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government