You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. ANALYSIS OF HANE 0-10 SECOND MHD EMP

    SBC: AUSTIN RESEARCH ASSOCIATES            Topic: N/A

    MODELING OF THE AMBIENT AND PROMPT IONOSPHERIC REGIONS IN A THIN LAYER APPROXIMATION ALLOWS AN EFFICIENT METHOD OF DETERMINING THE TIME EVOLUTION, PROPAGATION, AND SIGNAL STRENGTH OF THE 0-10 SECOND MHD EMP ASSOCIATED WITH HIGH ALTITUDE NUCLEAR DETONATIONS.

    SBIR Phase II 1987 Department of DefenseDefense Threat Reduction Agency
  3. Analysis of New WWVB Modulation Schemes for Future Broadcast

    SBC: XW, LLC dba Xtendwave            Topic: N/A

    This Phase 2 project targets the completion of the development of an improved system for the broadcasting of the WWVB signal, as a direct continuation of the Phase 1 project, which successfully validated the proposed approach through a feasibility study and analyses. Objectives of this project include the design of the new modulation scheme and protocol, the development of a new time-code generato ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  4. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. 3D Tip Characterization and Surface Reconstruction

    SBC: Nanometrology International, Inc.            Topic: 9070168TT

    Nanometrology International, Inc. (NMI) proposes to demonstrate the feasibility of 3-dimensional (3D) characterization of nanoscale objects using scanning probe microscopy (SPM) with a measurement uncertainty of less than 0.7 nm. To accomplish this task, we propose a novel method of 3D tip characterization and use of an innovative surface reconstruction algorithm recently introduced by NIST and th ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  6. EVALUATION OF WELL LOG DATA FOR DETERMINATION OF AIR AND/OR GAS FILLED POROSITY

    SBC: Restech Inc            Topic: N/A

    A PHYSICAL PROPERTY OF EARTH FORMATIONS THAT STRONGLY INFLUENCES THE RATE OF ATTENUATION OF A SHOCK WAVE IS THE BULK VOLUME OF AIR OR GAS ENTRAINED IN THE POROSITY. AS A RESULT, THE ACCURATE DETERMINATION OF THIS GAS VOLUME IS IMPORTANT FOR PREDICTING THE EFFECT OF A SHOCK WAVE ON SUBSURFACE STRUCTURES. THE OIL AND GAS INDUSTRY HAS USED GEOPHYSICAL WELL LOGS FOR YEARS TO IDENTIFY AND EVALUATE THE ...

    SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency
  7. Laser Direct Deposition Applied to the Manufacturing of Bulk, Net Shaped Metallic Glasses

    SBC: NANOHMICS INC            Topic: DTRA111003

    Manufacturing of bulk metallic glasses (BMG) requires very rapid cooling and some recent work in laser direct deposition or laser engineered net shaping (LENS) techniques has indicated the possibility of producing net shaped bulk quantities of these materials. To date several groups have had some initial success in forming BMG"s using laser direct deposition suggesting that a careful variation of ...

    SBIR Phase I 2011 Department of DefenseDefense Threat Reduction Agency
  8. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. Remote Sensing of CWAs Using Smart Polymers and RFID Readout

    SBC: LYNNTECH INC.            Topic: DTRA102006

    Military combatants face the threat of unconventional radiological, biological and chemical agents. Sensors that can detect the presence of these warfare modes, particularly chemical warfare agents, are vital to protecting U.S. forces personnel and their assets. Almost all of the currently available devices for chemical warfare agent detection require electrical power, wherein the power source it ...

    SBIR Phase I 2011 Department of DefenseDefense Threat Reduction Agency
  10. Research in Photoconductive Semiconductor Switching (PCSS)

    SBC: Applied Physical Electronics, L.C.            Topic: DTRA102010

    Applied Physical Electronics, LC (APELC) proposes to develop an innovative Silicon Carbide (SiC) Planar Avalanche Switch (PAS) in which a small optical pulse is used to initiate a planar avalanche over a large cross section instead of the filamentary avalanche that is optically initiated in GaAs. The solicitation seeks filamentary avalanche switches based on the large amount of previous work in ...

    SBIR Phase I 2011 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government