You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: ADVANCED POWDER SOLUTIONS INC            Topic: DLA08001

    SD

    SBIR Phase II 2011 Department of DefenseDefense Logistics Agency
  2. Affordable Titanium Alloy Fittings and Other Discrete Parts by Powder Metal Manufacturing technology

    SBC: DYNAMET TECHNOLOGY, INC.            Topic: DLA10001

    The Defense Logistics Agency (DLA) procures significant quantities of Ti-6Al-4V hydraulic fittings in a wide range of types and sizes in maintaining legacy aircraft. These fittings are machined from forged preforms or, in the case of low volume procurement, are machined from wrought plate stock. The proposed technology is a radical

    SBIR Phase I 2011 Department of DefenseDefense Logistics Agency
  3. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. A Single Aperature Dual-Wavelength Dual Polarized Antenna for AWRAP

    SBC: REMOTE SENSING SOLUTIONS, INC.            Topic: 834D

    Severe weather impacts our daily lives, society and nation’s economy. From an average of $10B (2005 dollars) annual loss due to tropical cyclones since 1900 to $200B in the commercial shipping industry that is threatened by severe ocean storms to the hundreds of lives and assets being lost in the $20B recreational boating industry. In these cases and many more, accurate now-casting and forecasti ...

    SBIR Phase I 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  5. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. Method for Improving Precision Grinding Quality and Productivity

    SBC: COVENTRY ASSOCIATES, INC.            Topic: DLA10001

    The objective of this proposal is to develop a self calibrating, low cost adaptive precision grinding system which provides real time workpiece taper and Scientific Measurement and Adaptive Response Techniques (SMART) control. This system incorporates the knowledge gained during the previous 20 plus years of research to make grinding a science rather than an art. Our approach utilizes a unique rot ...

    SBIR Phase I 2011 Department of DefenseDefense Logistics Agency
  7. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  8. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. Scale up of HVD parylene HT deposition process for economic continuous production of magnet wire

    SBC: AERODYN ENGINEERING, INC.            Topic: DLA10001

    The highest available operating temperature for magnet wire is 240 degrees C. As electromagnetic performance is directly related to the density of winding turns times the operating current, the maximum operating temperature of magnet wire is the largest single constraint to advancements in high performance and high temperature electronics. It

    SBIR Phase I 2011 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government