You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Ternary SLS for 2-Color LW/LW FPA for Interceptor Seekers

    SBC: INTELLIGENT EPITAXY TECHNOLOGY, INC.            Topic: MDA10012

    This Phase I SBIR effort will develop robust and high performance infrared detector technology based on GaSb-based Type II strained-layer superlattices (SLS). The advanced device design will be based on the Naval Research Lab (NRL) W-barrier and Ternary absorber epitaxy materials system. The detector design will focus on the two-color LW/LW for interceptor seeker application. The SLS detector des ...

    SBIR Phase I 2011 Department of DefenseMissile Defense Agency
  2. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. A LOW COST PRODUCT DESIGNED TO INTERFACE WITH A PERSONAL COMPUTER, WHICH WILL VOCALIZE WORDS IN THE COMPUTER'S MEMORY.

    SBC: Dynamic Industries Corp.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Education
  4. Computer Adaptive Triarchic Assessment and Instructional Activities for Early Childhood

    SBC: Children's Progress            Topic: N/A

    Purpose: Prior research has shown that students who are considered to be gifted generally have high levels of academic performance, motivation, creativity, critical thinking skills, and positive self-concepts. Perhaps because the general perception is that gifted students will flourish under any conditions, support for gifted children may be limited within some schools. The purpose of this project ...

    SBIR Phase II 2011 Department of Education
  5. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. Development of a High Strength Low Thermal Diffusivity Insulator Material

    SBC: C9 Corporation            Topic: MDA09012

    The C9 team proposes to exploit the success of the phase I effort by fabricating and doing full scale testing of the Throttling Divert and Attitude Control System(TDACS) Throat support for the Block IIA or Block IIB upgrades of the SM-3 Missile Defense system. The desired goal is to be production ready for BlockIIA which is currently in Critical Design Review with full scale testing in the 3rd qua ...

    SBIR Phase II 2011 Department of DefenseMissile Defense Agency
  7. DEVELOPMENT OF VISUAL INSTRUCTION MATERIALS FOR MATH AND SCIENCE CURRICULUM USING THE TOPOLOGICAL PANORAMA CAMERA

    SBC: Janet Gelphman Photography            Topic: N/A

    LEARNING ABILITIES IN MATHEMATICS AND THE SCIENCES ARE NOT MAXIMIZED BECAUSE OF THE LACK OF VISUAL INSTRUCTIONAL MATERIALS. THE IMPROVEMENT OF THESE SKILLS IS IMPORTANT BECAUSE BETTER SCIENCE AND MATH ABILITIES ARE NEEDED IN THE UNITED STATES IN ORDER TO KEEP UP WITH OTHER INDUSTRIALIZED NATIONS. OUR PROPOSED SOLUTION IS TO USE A NEW TECHNOLOGY, THE TOPOLOGICAL PANORAMA CAMERA, TO CREATE COST-EFFE ...

    SBIR Phase I 1987 Department of Education
  8. Efficient Sensor Management for Optimal Multi-Task Performance (ES-MaTe)

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: MDA10002

    Knowledge Based Systems, Inc. (KBSI) proposes to investigate innovative methodologies and algorithms for Efficient Sensor Management for Optimal Multi-Task Performance (ES-MaTe), The goal of the proposed research is to investigate an efficient sensor resource management method for sensor scheduling specific to tasks required by a missile defense system. The Ballistic Missile Defense System uses ...

    SBIR Phase I 2011 Department of DefenseMissile Defense Agency
  9. Game Theoretic Resource Optimization for Battle Management

    SBC: VCRSOFT LLC            Topic: MDA09026

    The resource allocation problem and the associated resource management solution is composed of three levels. At the highest level is the game theoretic mapping of alternative offense and defense actions, much like a chess game. At the next level is the large-scale efficient mathematical optimization formulation of the game theory matrix. At the last level is the solution of each optimization sub-p ...

    SBIR Phase II 2011 Department of DefenseMissile Defense Agency
  10. Innovative Sensor Packaging and Testing

    SBC: CRITICAL IMAGING, LLC            Topic: MDA10024

    This proposal addresses the need for innovative test packaging to permit testing of new focal plane arrays, read-out integrated circuit designs and related components in a mission relevant environment. We address the middle stage development gap that exists between FPA prototype and sensor system testing to support an evolutionary capability-based acquisition model with spiral technology developm ...

    SBIR Phase I 2011 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government