Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. Client-Centered Calibration of the NOAA Climate Forecast System

    SBC: PRESCIENT WEATHER LTD            Topic: 821C

    Prescient Weather proposes four Phase I tasks to increase the value of the new NOAA Climate Forecast System to commercial customers. The capabilities demonstrated and explored in Phase I will be developed and integrated in Phase II as components of a new Seasonal Information and Decision Support System (SIDSS) for our World Climate Service customers. The Phase I tasks are: • Improve season for ...

    SBIR Phase I 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  3. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. Multi-Modal Sensor with Real Time Telemetry for Storm Surge and other Meteorological Measurements

    SBC: Hyperion Technology Group, Inc.            Topic: 836N

    Storm surge poses a grave threat to both life and property as hurricanes make landfall. The ability to monitor surge in real-time using a densely-space network of sensors with integrated data recording and telemetry would provide NOAA with a unique capability. Our approach is to offer a system which incorporates a flexible multi-modal data acquisition platform with integrated telemetry for real-ti ...

    SBIR Phase I 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government