You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADAPTIVE GRID TECHNIQUES FOR USE IN COMPUTATIONAL FLUID DYNAMICS

    SBC: Computational Mechan            Topic: N/A

    THIS PROJECT FOCUSES ON THE TWO MOST IMPORTANT ISSUES OF ALL OF COMPUTATIONAL FLUID DYNAMICS: 1) HOW GOOD ARE THE NUMERICAL ANSWERS OBTAINED IN A COMPUTATION? AND 2) HOW CAN THE BEST POSSIBLE ANSWERS BE OBTAINED FOR A FIXED AND LIMITED COMPUTATIONAL EFFORT, BUDGET, OR COMPUTING CAPABILITY? IN GENERAL TERMS THE ANSWERS TO THESE QUESTIONS ARE 1) TO DETERMINE RELIABLE A-POSTERIORI ESTIMATES OF ERROR ...

    SBIR Phase II 1987 Department of DefenseAir Force
  2. ADVANCED CUTTER DEVELOPMENT FOR EGRESS BORING MACHINES

    SBC: Terra Tek Inc.            Topic: N/A

    CURRENT EGRESS BORING MACHINES, UTILIZING CONVENTIONAL 17-INCH DISC CUTTERS, ARE CAPABLE OF ACHIEVING MAXIMUM ADVANCE RATES OF 80 FEET PER HOUR, BECAUSE OF CUTTER LIMITATIONS. THE AIR FORCE HAS DETERMINED THAT NATIONAL NEEDS REQUIRE SUBSTANTIALLY FASTER BORING RATES. ALSO, IT IS CRUCIAL THAT THE CUTTERS BE CAPABLE OF COMPLETING THE EGRESS SHAFT, WITHOUT ANY MAINTENANCE/REPLACEMENT OF THE CUTTERS. ...

    SBIR Phase I 1987 Department of DefenseAir Force
  3. Advanced Dielectric Insulation Techniques for High Voltage Pulsed Power Systems

    SBC: Applied Physical Electronics, L.C.            Topic: AF093014

    ABSTRACT: The proposed phase II effort would work to establish new advanced insulation techniques and their corresponding design guidelines that could be employed to reduce the volume existing pulsed power systems, improve their reliability, and possibly improve their mechanical integrity. Additionally, the design of a new pulser is proposed, which will be based on the insulation schemes identifi ...

    SBIR Phase II 2011 Department of DefenseAir Force
  4. ADVANCED FUEL CELLS

    SBC: Treadwell Corp            Topic: N/A

    THE MOST CRITICAL ASPECT OF THE RADIO FREQUENCY POWER SUPPLY FOR THE NEUTRAL PARTICLE BEAM INTEGRATED EXPERIMENT IS ITS POWER TO WEIGHT RATIO. IN ADDITION, THE SPACE-QUALIFIED 45V POWER SUPPLY MUST BE ABLE TO SUPPLY 27,000 AMP PULSES DOWN TO 350 MICROSECONDS WITH ONLY A 2 - 3% VOLTAGE DROP. PROTON EXCHANGE MEMBRANE FUEL CELLS HAVE POTENTIALLY THE HIGHEST POWER TO WEIGHT RATIO OF ANY TYPE OF FUEL C ...

    SBIR Phase I 1987 Department of DefenseAir Force
  5. A Framework for Robust Engineering of Large-Scale Distributed Real-Time Systems

    SBC: L&S COMPUTER TECHNOLOGY, INC.            Topic: AF083047

    Our Phase I project addressed the challenge of creating a new paradigm for the development of software in which developers evaluate the performance of software architecture and design options early when it can have the greatest impact. Our vision moves software performance analysis from an isolated set of tools that require laborious manual transfer of information among design and analysis tools t ...

    SBIR Phase II 2011 Department of DefenseAir Force
  6. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. ANALYSIS OF PSYCHOPHYSIOLOGICAL MEASUREMENTS TO SUPPORT BIOFEEDBACK CONTROL MECHANISMS

    SBC: Transform Index Technologies            Topic: N/A

    THE PURPOSE OF THE PROPOSED RESEARCH IS TO DEMONSTRATE A SOFTWARE SYSTEM THAT MAKES CORRELATIONAL/FACTOR TYPE ANALYSES OF LARGE DATA BASES PRACTICAL ON MICROCOMPUTER-CLASS MACHINES, AND IS ABLE TO COMPUTE THE SIGNIFICANCE OF PSYCHOPHYSIOLOGICAL MEASUREMENTS AT A SPEED THAT MAKES REAL-TIME FEEDBACK CONTROL MECHANISMS POSSIBLE. THE SOFTWARE PROTOTYPE DEVELOPED WILL ACCESS A DATA BASE COMPOSED OF A W ...

    SBIR Phase II 1987 Department of DefenseAir Force
  8. A New Hyperspectral Image Capture Tool for Evaluating TBI

    SBC: LYNNTECH INC.            Topic: OSD09H23

    Traumatic Brain Injury accounts for 1525% of all combat casualties and on today"s battlefield, 30-40% of all injuries have a head injury component. The implication of TBI related injuries on the fighting force is that unit readiness is slowed as a result of diminished soldier reaction time and behavioral issues that may reduce the soldier"s responsiveness. Current methods of TBI diagnosis vary f ...

    SBIR Phase II 2011 Department of DefenseAir Force
  9. A NEW SCIENTIFIC INSTRUMENT FOR BIOGENETIC TOXICITY TESTING

    SBC: North Star Research Inc            Topic: N/A

    BASED ON OUR RESEARCH, WE FEEL THAT THE STAINING PROPERTIES OF SITS (4-ACETOAMIDO-4'-ISOTHIOCYANOSTILBENE 2,2' DISULPHONIC ACID), A REAGENT WHICH ENABLES IN SITU VISUALIZATION AND DISCRIMINATION AMONG LIVING, DYING AND DEAD CELLS, MAKE IT A GOOD CANDIDATE FOR USE IN AN APPROPRIATELY DESIGNED INSTRUMENT. WE PROPOSE AN AUTOMATED VIDEO MICROSCOPE WITH MEMORY AND POSSIBLE REMOTE VIEWING CAPABILITY. IT ...

    SBIR Phase I 1987 Department of DefenseAir Force
  10. AN INTELLIGENT KNOWLEDGE SYSTEM FOR SELECTION OF MATERIALS FOR CRITICAL AEROSPACE APPLICATIONS (IKSMAT)

    SBC: Mpd            Topic: N/A

    THE PROPOSED PHASE I PROJECT WOULD ESTABLISH THE FEASIBILITY AND DEVELOP THE SPECIFICATIONS AND WORK PLAN FOR THE DEVELOPMENT OF A PROTOTYPE COMPUTERIZED SYSTEM (PHASE II) FOR THE SELECTION AND PRELIMINARY DESIGN OF CRITICAL AEROSPACE COMPONENTS. THE SYSTEM WOULD PROVIDE A RELIABLE MATERIALS PROPERTY KNOWLEDGE BASE AND THE INFERENCE CAPABILITY TO PERMIT RAPID AND SOPHISTICATED COMPARISONS OF CANDI ...

    SBIR Phase I 1987 Department of DefenseAir Force
US Flag An Official Website of the United States Government