You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. ANALYSIS OF HANE 0-10 SECOND MHD EMP

    SBC: AUSTIN RESEARCH ASSOCIATES            Topic: N/A

    MODELING OF THE AMBIENT AND PROMPT IONOSPHERIC REGIONS IN A THIN LAYER APPROXIMATION ALLOWS AN EFFICIENT METHOD OF DETERMINING THE TIME EVOLUTION, PROPAGATION, AND SIGNAL STRENGTH OF THE 0-10 SECOND MHD EMP ASSOCIATED WITH HIGH ALTITUDE NUCLEAR DETONATIONS.

    SBIR Phase II 1987 Department of DefenseDefense Threat Reduction Agency
  3. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  4. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. EVALUATION OF WELL LOG DATA FOR DETERMINATION OF AIR AND/OR GAS FILLED POROSITY

    SBC: Restech Inc            Topic: N/A

    A PHYSICAL PROPERTY OF EARTH FORMATIONS THAT STRONGLY INFLUENCES THE RATE OF ATTENUATION OF A SHOCK WAVE IS THE BULK VOLUME OF AIR OR GAS ENTRAINED IN THE POROSITY. AS A RESULT, THE ACCURATE DETERMINATION OF THIS GAS VOLUME IS IMPORTANT FOR PREDICTING THE EFFECT OF A SHOCK WAVE ON SUBSURFACE STRUCTURES. THE OIL AND GAS INDUSTRY HAS USED GEOPHYSICAL WELL LOGS FOR YEARS TO IDENTIFY AND EVALUATE THE ...

    SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency
  6. Field-Deployable, High Resolution, High Pressure Xenon Gamma Ray Spectrometer

    SBC: PROPORTIONAL TECHNOLOGIES, INC.            Topic: DTRA05006

    There is a need for the detection and characterization of specific radioisotopes in the interest of homeland security, treaty verification, and customs. Current high resolution spectrometers require operating temperatures at liquid nitrogen levels and are highly expensive to maintain. Other spectrometers which operate at room temperatures do not afford the resolution required to distinguish and id ...

    SBIR Phase I 2005 Department of DefenseDefense Threat Reduction Agency
  7. Laser Direct Deposition Applied to the Manufacturing of Bulk, Net Shaped Metallic Glasses

    SBC: NANOHMICS INC            Topic: DTRA111003

    Manufacturing of bulk metallic glasses (BMG) requires very rapid cooling and some recent work in laser direct deposition or laser engineered net shaping (LENS) techniques has indicated the possibility of producing net shaped bulk quantities of these materials. To date several groups have had some initial success in forming BMG"s using laser direct deposition suggesting that a careful variation of ...

    SBIR Phase I 2011 Department of DefenseDefense Threat Reduction Agency
  8. Modeling and Prediction of Ground Shock Induced by Penetrating Weapons in Spatially Random Geologic Media

    SBC: Thornton Tomasetti, Inc.            Topic: DTRA04009

    We propose a stochastic-finite-element based methodology to address these requirements: (i) Characterize material variability; (ii) Quantify corresponding ground-shock variability; and (iii) Design instrumentation plan. The site is discretized into N finite-elements; rock properties over this domain are characterized as the components of an N-vector stochastic field. The probabilistic characterist ...

    SBIR Phase I 2005 Department of DefenseDefense Threat Reduction Agency
  9. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  10. Rad Effects in Semiconductor Electronics

    SBC: Silicon Space Technology Corporation            Topic: DTRA05001

    Silicon Space Technology and team member ATK Mission Research, along with Jazz Semiconductor, propose to demonstrate a comprehensive methodology for TCAD simulation using leading-edge Synopsys tools. These tools are capable of 3-D process and device simulation, enabling Mixed-Mode simulations studies of radiation particles with silicon devices and their response to the circuit. We will collabora ...

    SBIR Phase I 2005 Department of DefenseDefense Threat Reduction Agency