You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  3. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. Development of Native Kelp Culture System Technologies to Support Sea Vegetable Aquaculture in New England Coastal Waters

    SBC: OCEAN APPROVED, INC.            Topic: 817

    This Phase II research expands Phase I research on Saccharina latissima and is to design and develop “seed” nursery methodologies for the development of commercial-scale production of juvenile kelp plants including Alaria esculenta and Laminaria digitata. The project objectives include: 1. Isolate and maintain cultures of New England species of Alaria esculenta and laminaria digitata to be use ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Natural Adjuvants to Enhance Efficacy of Viral Vaccines for Mariculture

    SBC: ProFishent Inc            Topic: 812

    Marine aquaculture production now exceeds 20 million metric tons annually (FAO 2010) but viral diseases are still a major threat to the expansion of sustainable mariculture systems (National Marine Fisheries Service 2007). Pathogenic viruses continue to devastate many fish and shellfish operations every year (ICES Mariculture Committee 2004, Lightner 2011). To date, vaccines against aquatic anim ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  6. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government