You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Improving Commercial Fish Meal Free Aquaculture Diets

    SBC: Bell Aquaculture            Topic: 92

    Domestic US aquaculture is moving toward fishmeal replacement in aquafeeds with a variety of alternative protein sources including plant-based, terrestrial and marine proteins. In our Phase I work we showed the feasibility of modifying the protein quality of several alternate protein sources, specifically animal byproduct meals, and its potential significant impacts on marine fish production. Th ...

    SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  2. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government