You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  2. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1989 Nuclear Regulatory Commission
  3. QUANTITATIVE EFFECTS OF WORKER/DOSIMETER GEOMETRY ON DOSE MEASUREMENT

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    WORKER/DOSIMETER (W/D) GEOMETRY AND RELATIONSHIP TO A SOURCEOF RADIATION CAN PROVIDE FALSE RECORDING OF THE RADATION DOSE RECEIVED BY AN INDIVIDUAL. HENCE, TECHNOLOGY INTERNATIONAL INCORPORATED (TII) IS PROPOSING A TWO PHASE EFFORT WHICH INVOLVES A COMPUTER SIMULATION EXPERIMENT USING GEOMETRIC MODELING IN CONJUNCTION WITH A DOSE COMPUTATION ALGORITHM, FOLLOWED BY PERFORMANCE OF EXPERIMENTEMPLOYIN ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  4. EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS

    SBC: O'donnell Consulting Engineers            Topic: N/A

    STRESSES DUE TO PRESSURE AND REPEATED THERMAL CYCLING CAUSE PROGRESSIVE MATERIAL DAMAGE DURING THE OPERATION OF LWR COMPONENTS AND PIPING SYSTEMS. THE PRESENT PRO POSED RESEARCH WOULD IMPROVE THE ACCURACY OF EXISTING S- N FATIGUE EVALUATION METHODS BY COMBINING THEM WITH THE ADVANCED TECHNOLOGY OF CRACK PROPAGATION AND FRACTURE MECH ANICS. ENVIRONMENTAL EFFECTS WILL BE INCLUDED IN THE CRACK PROPAG ...

    SBIR Phase II 1986 Nuclear Regulatory Commission
  5. FUNCTIONAL CONDITION OF SOLENOID-OPERATED VALVES USED IN NUCLEAR POWER PLANT SAFETY APPLICATIONS

    SBC: Pentek Inc.            Topic: N/A

    PENTEK WILL DEVELOP AND TEST A TECHNIQUE TO DETERMINE THE FUNCTIONALITY OF SOLENOID-OPERATED VALVES IN A NUCLEAR POWERPLANT BASED ON THE MEASUREMTNT AND ANALYSIS OF IN-RUSH CURRENT. THE TECHNIQUE WILL BE DEVELOPED SO THAT ALL MEASUREMENTS CAN BE MADE FROM OUTSIDE THE REACTOR BUILDING WITHOUT DISTRUBING ANY ELECTRICAL CONNECTIONS. THE ANALYSIS METHODS WILL BE DEVELOPED FOR ON-LINE USE WITH A PERSON ...

    SBIR Phase I 1986 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government