You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SEISMIC PRA
SBC: Future Resources Associate Inc Topic: N/ATECHNIQUES HAVE RECENTLY BEEN DEVELOPED FOR PROBABILISTIC ANALYSIS OF THE RISK FROM EARTHQUAKE-INITIATED ACCIDENTS AT NUCLEAR POWER REACTORS. THESE TECHNIQUES ARE NOW BEGINNING TO BE APPLIED AS PARTS OF LARGER PRA STUDIES. HOWEVER, THE RESULTS OF APPLYING THESE SEISMIC PRA TECHNIQUES ARE STILL HIGHLY UNCERTAIN, AND THE INSIGHTS GAINED SO FAR FOR SPECIFIC REACTORS ARE DIFFICULT TO GENERALIZE. THIS ...
SBIR Phase II 1984 Nuclear Regulatory Commission -
PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL
SBC: Levy S Inc Topic: N/ATHIS PROPOSAL DESCRIBES A PROGRAM FOR THE DEVELOPMENT OF A PRESSURIZED WATER REACTOR (PWR) TRANSIENT ANALYSIS MODEL FOR USE ON A MICROCOMPUTER. THE INTENDED APPLICATION OF THIS PWR MODEL IS FOR ANALYSIS OF PWR SYSTEM RESPONSE, INCLUDING FORCED AND NATURAL CIRCULATION OPERATION. THE PRIMARY USER OF SUCH A MODEL WOULD BE A UTILITY OR NUCLEAR REGULATORY COMMISSION (NRC) ENGINEER OR PLANT OPERATOR PER ...
SBIR Phase II 1984 Nuclear Regulatory Commission -
PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS
SBC: Linsley Kraeger Associates Ltd Topic: N/AN/A
SBIR Phase I 1984 Nuclear Regulatory Commission -
STUDY ON AVAILABILITY AND COMPOSITION OF METAL BEARING WASTES
SBC: N.h. Parker, P.e. And Topic: N/ATHE WASTE STREAMS PRODUCED IN MANY MINERAL PROCESSING PLANTS ARE OFTEN TREATED ON AN "AD HOC" BASIS, MEETING THE ESSENTIAL REQUIREMENTS AT A GIVEN TIME. THESE WASTES DO CONTAIN VALUABLE METALS, WHICH ARE NOT RECOVERED DUE TO LACK OF OVERALL PLANNING OR DUE TO NONOPTIMAL PROCESSING. OPTIMIZING EXISTING PROCESSES OR INNOVATIVE PROCESS DESIGN FOR TREATMENT OF THESE WASTES WOULD YIELD VALUES, CONSERVE ...
SBIR Phase II 1984 Nuclear Regulatory Commission