You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
The S0 UAS, an Air Deployed Solution for Boundary Layer Observations in Turbulent Environments
SBC: BLACK SWIFT TECHNOLOGIES LLC Topic: 8213Previous efforts have demonstrated that targeted observations of tropical storms by UAS can provide extremely valuable data sets for improving forecasts and models, but are also difficult to obtain. A number of obstacles including regulations and the distance required to intercept evolving storms have limited the number of land based flights. The use of airborne deployed UAS have recently overcome ...
SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration -
Development of a Solar Powered Aerosol Reference Calibrator
SBC: Access Sensor Technologies LLC Topic: 813This project will develop and demonstrate an inexpensive and portable calibration system for low-cost aerosol sensors. Current calibration methods are cost prohibitive and lack generalizability from one location (or season) to the next, making them impractical for implementation. Access Sensor Technologies (AST) proposes to improve and validate a solar powered aerosol reference calibrator (SPARC) ...
SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration -
Bottom Feeder- A Highly Maneuverable Autonomous Underwater Vehicle
SBC: Tridentis Advanced Marine Vehicles LLC Topic: 822The Bottom Feeder project is designed to prove out the research done in Phase I using a prototype platform. The prototype will be a full size version of the platform designed during Phase I. The Phase I platform was designed to work in two operational configurations, a highly efficient mode and a highly maneuverable mode, with the ability to switch between them while submerged. The platform is equ ...
SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration -
Tactical Active Anti-Fogging Goggle or Spectacle
SBC: TDA RESEARCH, INC. Topic: SOCOM181003The military combat eye protection (MCEP) program is designed to protect our soldiers' eyes from the external threats of fragmentation, electromagnetic radiation, wind, dust, sand, etc. and greatly improve both safety and operational effectiveness. However, the goggles and spectacles on the Military’s authorized protective eyewear list (APEL) are only effective if the soldier is wearing them. Fo ...
SBIR Phase II 2019 Department of DefenseSpecial Operations Command -
Low Signature Optical Guidance of Low Collateral Munitions
SBC: CORVID TECHNOLOGIES, LLC Topic: SOCOM061008At present, there are no solutions for equipping Class 1 and 2 unmanned aerial system (UAS) platforms with weapons systems that provide the capability for opportunistic engagement of high value targets (HVT). Munitions deployed on larger UAS, and other fixed-wing SOCOM assets, greatly exceed the payload capacity of Class 1 and 2 UAS assets currently in use for intelligence, surveillance, and recon ...
SBIR Phase II 2019 Department of DefenseSpecial Operations Command -
Geospatial Database for Storm Risk Assessment
SBC: Riverside Technologies Inc. Topic: 841DIn Phase I, Riverside investigated the need for increased access to NCDC storm data using web Application Programming Interfaces (APIs) to connect severe weather and socioeconomic information. The focus of Phase I was to design and validate an architecture that specifies the methods through which the NCDC Storm data can be programmatically accessed, processed, and displayed in easy to use interfac ...
SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
A Stereo Camera System for Measuring Coastal Currents
SBC: 3SRM INC. Topic: 844WPInexperienced swimmers are often unaware of the presence of treacherous rip currents and this leads to many drowning deaths each year. Even when signs are posted, the public probably does not clearly understand the danger. It would be more informative if the public were ale to maps of the location, speed, and direction of coastal currents. Ocean safety officials are using various methods to inform ...
SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Monitoring Active Region Development of the Far-Side of the Sun
SBC: NORTHWEST RESEARCH ASSOCIATES, INC. Topic: 841WSolar active regions have a major impact on space weather. Knowledge of active regions in the Sun’s far hemisphere can improve forecasts of impending solar storms and future UV irradiance variations that negatively impact spacecraft, communications, and navigation facilities, thus making knowledge of active region locations and strengths of great benefit to society. We will use algorithms based ...
SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Maritime Surface Search Phased Array for Combatant-Craft
SBC: FIRST RF CORPORATION Topic: SOCOM15001In this Phase I effort, FIRST RF will develop and evaluate concepts for advanced Surface Search Phased Array radar systems that will be integrated on Naval Special Warfare Combatant-Craft. A phased array system allows for dynamic beam steering with graceful degradation and eliminates the need for mechanical pointing of the antenna aperture. The FIRST RF SSPA radar system will detect, locate, track ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Covert Modular Situational Awareness Monitor
SBC: ADA TECHNOLOGIES, INC. Topic: SOCOM05010A need exists for inexpensive, disposable, broadcast capable chemical / explosive-compound sensors that also provide site weather conditions. The state-of-the-art does not meet the need described both in terms of CWA sensor cost/size and lack of a low-cost deployment system. ADA proposes under this three-phased SBIR program to develop a system comprised of a suite of covert, modular, lightweight ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command