You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Next-Generation Ear Seals for Circumaural Headsets and Hearing Protectors
SBC: Oceanit Laboratories, Inc. Topic: DHA172007Service members are exposed to high noise environments on a daily basis. Aviation, mechanized, light and armored units are all exposed to environments well in excess of the permissible noise levels. In aviation alone, flight crews spend a majority of thei
SBIR Phase II 2019 Department of DefenseDefense Health Program -
Clinical Evaluation of Biocompatible Dressings for the Delivery of Analgesics
SBC: Keratin Biosciences Inc. Topic: A14048The Phase I and Phase II projects that are the basis for this Phase II enhancement proposal tested the feasibility of releasing opiate compounds from a topical wound dressing for burn pain relief and treatment. This project culminated with a regulatory s
SBIR Phase II 2019 Department of DefenseDefense Health Program -
Low Signature Optical Guidance of Low Collateral Munitions
SBC: Corvid Technologies LLC Topic: SOCOM061008At present, there are no solutions for equipping Class 1 and 2 unmanned aerial system (UAS) platforms with weapons systems that provide the capability for opportunistic engagement of high value targets (HVT). Munitions deployed on larger UAS, and other fixed-wing SOCOM assets, greatly exceed the payload capacity of Class 1 and 2 UAS assets currently in use for intelligence, surveillance, and recon ...
SBIR Phase II 2019 Department of DefenseSpecial Operations Command -
Vertical Wind Profile Data Collection Using Laser Technology on Unmanned Delivery Platforms.
SBC: Oceanit Laboratories, Inc. Topic: SOCOM04007The current project will develop and demonstrate a prototype compact, power-efficient all-fiber lidar unit for wind profiling on board UAV's and other aircraft. The system leverages Oceanit's current fiber-laser based lidar development efforts. A unique design provides a rugged system with no moving parts and little maintenance requirements. Efforts in the current project will include prototype s ...
SBIR Phase II 2006 Department of DefenseSpecial Operations Command