You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Signal Matching via Computationally Efficient Hashing

    SBC: VADUM INC            Topic: NGA172003

    Vadum will develop and demonstrate a software tool for rapid, accurate matching of time-series data to a previously collected database. The Clustered, Shingled Hashing of Random Projections (C-SHARP) tool maps a library of time series data to a compact database of fingerprints. The tool enables efficient queries for matches to a new time series by identifying fingerprint similarity. To support dif ...

    SBIR Phase II 2019 Department of DefenseNational Geospatial-Intelligence Agency
  2. Conflation of 3D Foundation Data

    SBC: INTERNATIONAL ASSOCIATION OF VIRTUAL ORGANIZATIONS, INCORPORATED            Topic: NGA172007

    NGA seeks a solution to provide highly accurate foundation data of buildings, similar features, and linear structures by conflating information from multiple images and contributed content. Our solution “AMCON Geo” (Automated Multi-source Conflation, Geospatial) is a framework for combining multiple sources together to improve overall relative and absolute accuracies of the data, and increase ...

    SBIR Phase II 2019 Department of DefenseNational Geospatial-Intelligence Agency
  3. Low Signature Optical Guidance of Low Collateral Munitions

    SBC: CORVID TECHNOLOGIES, LLC            Topic: SOCOM061008

    At present, there are no solutions for equipping Class 1 and 2 unmanned aerial system (UAS) platforms with weapons systems that provide the capability for opportunistic engagement of high value targets (HVT). Munitions deployed on larger UAS, and other fixed-wing SOCOM assets, greatly exceed the payload capacity of Class 1 and 2 UAS assets currently in use for intelligence, surveillance, and recon ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  4. Vertical Wind Profile Data Collection Using Laser Technology on Unmanned Delivery Platforms.

    SBC: OCEANIT LABORATORIES INC            Topic: SOCOM04007

    The current project will develop and demonstrate a prototype compact, power-efficient all-fiber lidar unit for wind profiling on board UAV's and other aircraft. The system leverages Oceanit's current fiber-laser based lidar development efforts. A unique design provides a rugged system with no moving parts and little maintenance requirements. Efforts in the current project will include prototype s ...

    SBIR Phase II 2006 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government