You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. The S0 UAS, an Air Deployed Solution for Boundary Layer Observations in Turbulent Environments

    SBC: BLACK SWIFT TECHNOLOGIES LLC            Topic: 8213

    Previous efforts have demonstrated that targeted observations of tropical storms by UAS can provide extremely valuable data sets for improving forecasts and models, but are also difficult to obtain. A number of obstacles including regulations and the distance required to intercept evolving storms have limited the number of land based flights. The use of airborne deployed UAS have recently overcome ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Development of a Solar Powered Aerosol Reference Calibrator

    SBC: Access Sensor Technologies LLC            Topic: 813

    This project will develop and demonstrate an inexpensive and portable calibration system for low-cost aerosol sensors. Current calibration methods are cost prohibitive and lack generalizability from one location (or season) to the next, making them impractical for implementation. Access Sensor Technologies (AST) proposes to improve and validate a solar powered aerosol reference calibrator (SPARC) ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Bottom Feeder- A Highly Maneuverable Autonomous Underwater Vehicle

    SBC: Tridentis Advanced Marine Vehicles LLC            Topic: 822

    The Bottom Feeder project is designed to prove out the research done in Phase I using a prototype platform. The prototype will be a full size version of the platform designed during Phase I. The Phase I platform was designed to work in two operational configurations, a highly efficient mode and a highly maneuverable mode, with the ability to switch between them while submerged. The platform is equ ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  4. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    RESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    THE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government