You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Acquisition Demonstrator

    SBC: GBTI Solutions, Inc.            Topic: SOCOM181004

    By the conclusion of Phase 1, important discoveries were made concerning the technological, market, and business feasibility of the Rapid Acquisition Platform. We have concluded that the RAP is feasible and may proceed to product development. In Phase II, GBTI will develop an end-to-end RAP utilizing the scientific and technological discoveries made in Phase 1. Phase 2 will be implemented over the ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  2. Low Signature Optical Guidance of Low Collateral Munitions

    SBC: CORVID TECHNOLOGIES, LLC            Topic: SOCOM061008

    At present, there are no solutions for equipping Class 1 and 2 unmanned aerial system (UAS) platforms with weapons systems that provide the capability for opportunistic engagement of high value targets (HVT). Munitions deployed on larger UAS, and other fixed-wing SOCOM assets, greatly exceed the payload capacity of Class 1 and 2 UAS assets currently in use for intelligence, surveillance, and recon ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  3. Abrasion protection, ballistic tolerance, and laser protection for windows/sensor on rotary wing aircraft.

    SBC: INTER MATERIALS, LLC            Topic: SOCOM07007

    Some of the US Army SOCOM greatest concerns are to maintain the helicopter pilot’s ability to see clearly and to provide helicopter windscreens with a greater degree of erosion/abrasion protection than what is being currently afforded. Recent developments on polymer coatings demonstrate the potential to meet and exceed all erosion/abrasion resistance and optical requirements by using plasma depo ...

    SBIR Phase II 2009 Department of DefenseSpecial Operations Command
  4. Velocity Sensing Sonar for Naval Special Warfare Undersea Vehicles

    SBC: Advanced Systems/Supportability Engineering Technologies And Tools, Inc.            Topic: SOCOM05003

    This proposal responds to the need for a more capable velocity sensor for Naval Special Warfare undersea vehicles that will enable 3D bottom and water column tracking. Currently, the Advanced Seal Deployment System utilizes a Doppler Sonar capable of operations at altitudes of up to approximately 300 meters over the sea bed for bottom track mode. There is also a stated need to decrease weight, v ...

    SBIR Phase II 2006 Department of DefenseSpecial Operations Command
  5. Vertical Wind Profile Data Collection Using Laser Technology on Unmanned Delivery Platforms.

    SBC: FIBERTEK, INC.            Topic: SOCOM04007

    This program addresses the Special Operations need for a cost effective wind Lidar system enabling efficient delivery of psychological warfare material. Our approach involves the design, development and field demonstration of an all fiber transceiver allowing for the mapping of wind fields. The advantages of our approach include: • All Fiber based design resulting in a power efficient system, ...

    SBIR Phase II 2006 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government