You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automated SCAP Tool Validator (ASTV)

    SBC: ATC-NY INC            Topic: 9010377R

    The current testing methods of the NIST Security Content Automation Protocol (SCAP) Validation Program are largely manual and labor-intensive, making comprehensive validation of SCAP-enabled IT security products difficult and time-consuming. ATC-NY will design and develop the Automated SCAP Tool Validator (ASTV) for use with the SCAP Public Validation Test Suite and others. ASTV automates the conf ...

    SBIR Phase I 2013 Department of CommerceNational Institute of Standards and Technology
  2. Silicon Carbide Avalanche Photodiodes for Single-photon Direct Detection of Lyman-alpha Radiation

    SBC: Aymont Technology, Inc.            Topic: N/A

    In the proposed Phase I SBIR program, Aymont Technology and CoolCAD Electronics will design and demonstrate prototype silicon carbide (SiC) avalanche photodiodes (APD) specifically designed for high-efficiency, single-photon counting of 121.6 nm Lyman-alpha photons. This detector will be provided to relevant personnel at NIST for calibration and testing. Both discrete APDs and arrays will be used ...

    SBIR Phase I 2009 Department of CommerceNational Institute of Standards and Technology
  3. Refreshable Locking Tactile Image Array for Accessibility

    SBC: E L I A Life Technology Inc            Topic: N/A

    This is an SBIR Phase II proposal to develop a tactile refreshable computer display prototype (TRCD) that will support multiple tactile alphabets (e.g. ELIA, braille, and Roman), multiple lines of text, and graphics to benefit the more than 1.8 million blind Americans. Commercially available TRCDs are expensive (~$12,000, or $19 per actuator), provide only one line of text (with 640 actuators) and ...

    SBIR Phase II 2009 Department of CommerceNational Institute of Standards and Technology
  4. Time Synchronization of Wireless Sensor Networks

    SBC: ESENSORS INC.            Topic: N/A

    A wireless sensor and actuator network capable of providing precision time synchronization between the nodes of the network will be developed. The IEEE 1451.0 smart transducer interface and IEEE 1588 time synchronization standards will be combined, with additional software and hardware to provide synchronization between the clocks on the Wireless Transducer Interface Modules (WTIM) sensors/actuato ...

    SBIR Phase I 2009 Department of CommerceNational Institute of Standards and Technology
  5. Engineering Models for Damage to Structural Components Subjected to Internal Blast Loading

    SBC: Thornton Tomasetti, Inc.            Topic: DTRA08006

    Weidlinger Associates Inc. proposes to develop effective technology for simulating explosive detonations within civil buildings where the propagation of airblast and failure of weak internal walls are strongly coupled. We will conduct a field test program designed to complement other internal detonation testing efforts such as DTRA''s Distinct Cobra, expanding the available database. We will perfo ...

    SBIR Phase II 2009 Department of DefenseDefense Threat Reduction Agency
  6. High Fidelity Modeling of Building Collapse with Realistic Visualization of Resulting Damage and Debris

    SBC: Thornton Tomasetti, Inc.            Topic: DTRA082005

    An approach for performing high fidelity modeling for blast and progressive collapse simulations of buildings will be developed. The modeling approach will allow complete simulations of building response to be performed within several days of computing time on desktop PCs. An 'easy to use' modeling interface will also be demonstrated in this effort. All response regimes will be addressed includi ...

    SBIR Phase I 2009 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government