You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Extreme Environment Hand-Wear system

    SBC: Kreamer Sports, Inc.            Topic: N/A

    "Our Phase I study proved the feasibility of using monofilament carbon tow and thin resistant wire in a glove system to provide an adequate heat source to keep a soldier's hands comfortable in extreme cold temperatures while retaining hand dexterity andtactility. Our objectives during Phase II are to (1) incorporate our heat generation process into a super thin, non-melting, flame-rerardant materi ...

    SBIR Phase II 2002 Department of DefenseSpecial Operations Command
  2. Application of Turbine Engines in Naval Special Warfare (NSW) Craft

    SBC: Marine Turbine Technologies, L.L.C.            Topic: N/A

    The objective is to modify and test gas turbine engines presently installed in/on marine craft to demonstrate that by adapting technology used on street legal vehicles can be used to reduce the heat and noise levels in marine craft. Whether or not the IR15dB level or lower, and the above water acoustic/noise level to 60dB level or lower can be achieved, is a matter that can only be demostrated by ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  3. SOF Tactical Information Assistant

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    This Phase I SBIR Project will involve performance of a study to evaluate current commercial display technologies, head-mounted and wrist-mounted display configurations, and software that could fulfill the SOF requirements. The study will emphasizeidentification of the best display at the lowest power consumption. Based on the evaluation of current practice, innovative technology ideas will be pre ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  4. Quick-Attack/Reconnaissance Remote Vehicle Platform

    SBC: HDE ROBOTICS GROUP, INC.            Topic: N/A

    The Quick Attack Reconnaissance Remote Vehicle Platform is a remotely operated vehicle capable of performing combat and physical security missions. The modular platform features quick-change attachments that will accommodate a variety of weapon, video, audio, and bio/chemical sampling systems. The vehicle is able to operate in adverse climates and in rough terrain. The ground speed of the vehic ...

    SBIR Phase I 1998 Department of DefenseSpecial Operations Command
  5. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government