You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. On-Site Generation- The Safe, Effective, and Low Cost Disinfection Strategy

    SBC: MIOX Corporation            Topic: HSB042003

    The objective of the research presented in this Phase II proposal is to extend and understand the success of the Phase I work and to conduct the work plans developed in the Phase I activities. The primary objective of this research is to develop answers that will remove barriers to implementation of on-site generation technology as a replacement for chlorine gas, and to provide scientific answers ...

    SBIR Phase II 2006 Department of Homeland Security
  2. Chemical and Explosive Vapor Detection in Shipping Containers with Remotely Accessed Microcantilever Array Sensors

    SBC: NEVADA NANOTECH SYSTEMS, INC.            Topic: SB041005

    The remarkable sensitivity, compactness, low cost, low power-consumption, scalability, and versatility of microcantilever sensors make this technology possibly the best solution for container screening. In Phase I, Nevada Nanotech Systems (NNTS) successfully demonstrated all components of a prototype sensor system for measuring the concentrations of unlawful or hazardous materials in shipping con ...

    SBIR Phase II 2006 Department of DefenseDefense Advanced Research Projects Agency
  3. Individual Cooling Equipment

    SBC: R*BAT, INC.            Topic: SOCOM06009

    Special Operations forces (SOF) operate in all weather conditions. It has identified a need for a micro-cooling system that can be vehicle mounted and man-portable, as well as provide a capability to cool vehicle mounted communications and electronics equipment. To meet the needs of SOF the system must be small, lightweight, quiet, low power, and gasless. We propose a compact micro-cooling system ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  4. Optimized Network Sensing (ONS)

    SBC: RHINOCORPS, LTD CO.            Topic: N/A

    Optimized Network Sensing (ONS) is a Modeling and Simulation Toolset which provides the capability for rapid and cost effective evaluation of currently deployed Chemical/Biological sensor networks or design of new networks. The Phase I effort will demonstarte the feasibility of such a toolset and determine which software modules best optimize the solution. Proven modules will be integrated in a fl ...

    SBIR Phase I 2006 Department of Homeland Security
  5. EnerPak ¿an innovative power technology solution for advanced unattended ground sensors

    SBC: TPL, INC            Topic: N/A

    TPL proposes to demonstrate the feasibility of its EnerPak power solution for use in unattended ground sensors (UGS) for border security. The EnerPak combines energy harvesting technology with miniaturized electrochemical storage devices to provide a hybrid power source for sensors deployed in remote locations. Our solution uniquely meets the needs of border security UGS and delivers long life (at ...

    SBIR Phase I 2006 Department of Homeland Security
  6. PLASMA PROCESS CONTROL USONG MULTIPLE OPTICAL SENSORS

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    THE DEVELOPMENBT OF REAL-TIME PROCESS CONTROL FOR SEMICONDUCTOR DEVICE FABRICATION IS CRITICAL TO ADVANCING THE TECHNOLOGY IN MANUFACTURING MICROELECTRONIC CIRCUITS. IN PHASE I, RECENT ADVANCES IN TUNABLE DIODE LASER FABRICATION AND DETECTION TECHNOLOGY WILL BE EXPLOITED TO DEVELOP COMPACT AND COST EFFECTIVE INSTRUMENTATION FOR PLASMA PROCESS MONITORING AND CONTROL. PHASE I WILL FOCUS ON FLUORO-CA ...

    SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government