You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Application of Turbine Engines in Naval Special Warfare (NSW) Craft

    SBC: Marine Turbine Technologies, L.L.C.            Topic: N/A

    The objective is to modify and test gas turbine engines presently installed in/on marine craft to demonstrate that by adapting technology used on street legal vehicles can be used to reduce the heat and noise levels in marine craft. Whether or not the IR15dB level or lower, and the above water acoustic/noise level to 60dB level or lower can be achieved, is a matter that can only be demostrated by ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  2. Automated Detection and Cueing

    SBC: PERCEPTEK            Topic: SOCOM06001

    The single most effective method to thwart security threats posed by people with hostile intent is to detect their presence early. Unfortunately, large scale standoff detection of humans is difficult. Various sensors, including still and video cameras, have been designed and applied to human detection, however, to date a person is required to be in the detection loop since robust, automated detect ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. Color Sequential, Multi-Spectral Low-Light Imager

    SBC: I Technology Applications            Topic: N/A

    "This proposal describes a unique concept for a low light, compact image intensification system that provides multi-spectral input and output capability in contrast to the current broadband input/green output capability of conventional image intensificationdevices. Present image intensifiers use a broadband photocathode sensitive to visible and near-IR optical radiation and provide green imagery ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  4. Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft

    SBC: FIRST RF CORPORATION            Topic: SOCOM06002

    Current methods of transmitting low-frequency RF energy from airborne platforms involve antennas such as blades that are electrically inefficient and a place a large aerodynamic burden on the airframe. SOCOM desires a method of efficiently transmitting low-frequency energy (VHF-UHF) at high power levels from airborne platforms. The desired gain numbers (-2 to 0 dB) at these frequencies would requi ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  5. Covert Modular Situational Awareness Monitor

    SBC: ADA TECHNOLOGIES, INC.            Topic: SOCOM05010

    A need exists for inexpensive, disposable, broadcast capable chemical / explosive-compound sensors that also provide site weather conditions. The state-of-the-art does not meet the need described both in terms of CWA sensor cost/size and lack of a low-cost deployment system. ADA proposes under this three-phased SBIR program to develop a system comprised of a suite of covert, modular, lightweight ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  6. Extreme Environment Hand-Wear system

    SBC: Kreamer Sports, Inc.            Topic: N/A

    "Our Phase I study proved the feasibility of using monofilament carbon tow and thin resistant wire in a glove system to provide an adequate heat source to keep a soldier's hands comfortable in extreme cold temperatures while retaining hand dexterity andtactility. Our objectives during Phase II are to (1) incorporate our heat generation process into a super thin, non-melting, flame-rerardant materi ...

    SBIR Phase II 2002 Department of DefenseSpecial Operations Command
  7. Individual Cooling Equipment

    SBC: R*BAT, INC.            Topic: SOCOM06009

    Special Operations forces (SOF) operate in all weather conditions. It has identified a need for a micro-cooling system that can be vehicle mounted and man-portable, as well as provide a capability to cool vehicle mounted communications and electronics equipment. To meet the needs of SOF the system must be small, lightweight, quiet, low power, and gasless. We propose a compact micro-cooling system ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  8. MOCA: Monitoring of Crowd Activities

    SBC: SECURICS, INC.            Topic: SOCOM06014

    The MOCA project will develop a network-enabled DSP+FPGA-enhanced image-intensified embedded system for self-contained low-power monitoring of crowds in open and in complex urban terrain. The Phase I effort will develop new algorithms explicitly for crowd management, rather than building on the traditional intelligent video surveillance algorithms that are focused on isolated targets in motion. P ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  9. Remote Runway Survey System to Measure Soil Type, Load Bearing Capacity, Slope and Grades

    SBC: Omnitech Robotics International Llc            Topic: N/A

    "This proposal will outline a concept for a feasible, lightweight, unmanned Remote Runway Survey System (RRSS), using recent developments in sensor and processing technology. These developments in sensing and processing have provided the ability to sensethe environment and to autonomously navigate using low power, at a light weight and at a low cost. It is critical to obtain information about p ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  10. SOF Tactical Information Assistant

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    This Phase I SBIR Project will involve performance of a study to evaluate current commercial display technologies, head-mounted and wrist-mounted display configurations, and software that could fulfill the SOF requirements. The study will emphasizeidentification of the best display at the lowest power consumption. Based on the evaluation of current practice, innovative technology ideas will be pre ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government