You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Individual Cooling Equipment

    SBC: R*BAT, INC.            Topic: SOCOM06009

    Special Operations forces (SOF) operate in all weather conditions. It has identified a need for a micro-cooling system that can be vehicle mounted and man-portable, as well as provide a capability to cool vehicle mounted communications and electronics equipment. To meet the needs of SOF the system must be small, lightweight, quiet, low power, and gasless. We propose a compact micro-cooling system ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  2. Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft

    SBC: STAR-H CORP.            Topic: SOCOM06003

    Three trailing wire antenna concepts will be evaluated to find the design which best meets the requirements of the solicitation. Operational and design experience with the widely-used dual trailing wire antenna will represent the starting point for this analysis. Concepts for a single trailing wire, which will have wider applicability will also be studied. A third concept, using a more unique ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. SOF Tactical Repeater

    SBC: LAMBDA SCIENCE, INC.            Topic: SOCOM04006

    A SOF Tactical Repeater will be a small, rugged, lightweight, programmable, easily deployed, software radio repeater that can be awakened via RF, by an authorized user, from a passive sleep mode. One or more antennae should be deployed away from RF shadowing, with line of sight to all users. In Phase I, Lambda Science will develop emplacement / antenna deployment methods, standby / wake-up metho ...

    SBIR Phase I 2004 Department of DefenseSpecial Operations Command
  4. Advanced Microcalorimeter Instrumentation for X-Ray Microanalysis

    SBC: STAR CRYOELECTRONICS, LLC            Topic: N/A

    An innovative superconducting transition edge sensor (TES) microcalorimeter array with superconducting quantum interference device (SQUID) readouts is described for high energy and high spatial resolution X-ray energy dispersive spectroscopy and microanalysis. The proposed microcalorimeter instrument offers an energy resolution that is comparable to and potentially even better than wavelength disp ...

    SBIR Phase I 2004 Department of CommerceNational Institute of Standards and Technology
  5. Extreme Environment Hand-Wear system

    SBC: Kreamer Sports, Inc.            Topic: N/A

    "Our Phase I study proved the feasibility of using monofilament carbon tow and thin resistant wire in a glove system to provide an adequate heat source to keep a soldier's hands comfortable in extreme cold temperatures while retaining hand dexterity andtactility. Our objectives during Phase II are to (1) incorporate our heat generation process into a super thin, non-melting, flame-rerardant materi ...

    SBIR Phase II 2002 Department of DefenseSpecial Operations Command
  6. Application of Turbine Engines in Naval Special Warfare (NSW) Craft

    SBC: Marine Turbine Technologies, L.L.C.            Topic: N/A

    The objective is to modify and test gas turbine engines presently installed in/on marine craft to demonstrate that by adapting technology used on street legal vehicles can be used to reduce the heat and noise levels in marine craft. Whether or not the IR15dB level or lower, and the above water acoustic/noise level to 60dB level or lower can be achieved, is a matter that can only be demostrated by ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  7. SOF Tactical Information Assistant

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    This Phase I SBIR Project will involve performance of a study to evaluate current commercial display technologies, head-mounted and wrist-mounted display configurations, and software that could fulfill the SOF requirements. The study will emphasizeidentification of the best display at the lowest power consumption. Based on the evaluation of current practice, innovative technology ideas will be pre ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  8. Helmsman's Recording Accelerometer

    SBC: Conrad Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government