Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft

    SBC: STAR-H CORP.            Topic: SOCOM06003

    Three trailing wire antenna concepts will be evaluated to find the design which best meets the requirements of the solicitation. Operational and design experience with the widely-used dual trailing wire antenna will represent the starting point for this analysis. Concepts for a single trailing wire, which will have wider applicability will also be studied. A third concept, using a more unique ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  2. Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft

    SBC: Wang Electro-Opto Corporation            Topic: SOCOM06002

    This is an SBIR Phase-I proposal, under SOCOM Topic 06-002, “Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft.” A definite need exists to develop a family of appliqué antennas to be conformally mounted on various UAVs and manned aircraft for broadcast of PSYOPS messages at frequencies throughout the FM (87.5-108 MHz) and TV (174-230 MHz and 470-806 MHz) bands. To develop ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    In this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government