You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Cognitive Residential Heat Pump Fault Detection and Diagnostic Datalogger

    SBC: MANAGEMENT SCIENCES INC            Topic: 9010173R

    Millions of heat pumps are used to heat and cool homes and buildings year round. Continuous operation means that components wear out at a greater rate. As a result, maintenance of residential heat pumps is a major cost driver. Current methods focus on reduced use through control settings. Typically, demand has wide swings throughout the day and people are unable to customize controls. Inevitably, ...

    SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology
  2. Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft

    SBC: WANG ELECTRO-OPTO CORPORATION            Topic: SOCOM06002

    This is an SBIR Phase-I proposal, under SOCOM Topic 06-002, “Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft.” A definite need exists to develop a family of appliqué antennas to be conformally mounted on various UAVs and manned aircraft for broadcast of PSYOPS messages at frequencies throughout the FM (87.5-108 MHz) and TV (174-230 MHz and 470-806 MHz) bands. To develop ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    In this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government